Word Document

17. Resource Adequacy (RA) Portfolio Resources

18. Certification of LSE Resource Adequacy Compliance Filing

19. Submission of RA Filings - Secure FTP

20. Correction of Errors: Minor or Substantial

1 Section 4.2.6 of D.08-04-023

2 The CPUC mailed out 2009 DR allocations, Local RA, and load forecasts by Secure FTP on July 30, 2008. Some of this information originated with the CEC, but it was mailed to the LSEs by the CPUC.

3 D.05-10-042 page 53

4 Does not include filings for System RAR

5 The transfer capacity on Path 26 must be de-rated to accommodate ETCs that are used to serve load outside the CAISO control area. "Loop flow" is common to large electric power systems and must be accommodated to prevent overloading of lines.

Top Of Page