· Construct an uncompensated, single circuit 500 kV transmission line between Los Banos and Gates substations.

· Convert the Gates 500 kV bus from a ring bus arrangement to a breaker-and-a-half arrangement.

· Install 250 MVAR of 500 kV of shunt capacitors at both Gates and Los Banos

· Upgrade the Gates-Midway 230 kV line by either reconductoring portions of this line or by applying a temperature adjusted rating.

16 PG&E's power system study that evaluated this plan of service, along with alternatives, is described in Exhibit (Exh.) 214, Section 6.