Background

D.89-01-040 sets a schedule for San Diego Gas & Electric Company (SDG&E), Pacific Gas and Electric Company (PG&E), Southern California Edison Company (Edison), and Pacific Power and Light Company (PP&L) to file proposed electric rate design window revisions, but does not specify that new docket numbers be assigned to the filings. The electric utilities have been filing these applications under the existing docket numbers that have been used for prior rate design window filings. For example, on November 1, 1999, SDG&E filed an application proposing electric rate design window revisions under Application (A.) 91-11-024.