| Word Document PDF Document |
ATTACHMENT A
ISSUES AND OUTCOMES
LINE NO. |
ISSUE |
BRIEF DESCRIPTION |
OUTCOME |
||||
SBC |
MCI |
OTHER | |||||
CHAPTER 4 - General Terms and Conditions | |||||||
1 |
GT&C 3 |
One free name change |
X |
||||
2 |
GT&C 5 |
Evergreen provision |
X |
||||
3 |
GT&C 6 |
Deposits |
X | ||||
4 |
GT&C 7 |
Failure to pay or dispute bill |
X |
||||
5 |
GT&C 8 |
Audit requirements |
X |
||||
6 |
GT&C 9 |
Intervening law clause |
X |
||||
7 |
GT&C 10 |
MCI purchase from either ICA or tariff |
X |
||||
CHAPTER 5 - Definitions | |||||||
8 |
Def 3 |
End User |
X |
||||
CHAPTER 6 - Network Interconnection Method (NIM) | |||||||
9 |
NIM 4 |
Definition of Access Tandem |
X |
||||
10 |
NIM 5 |
Definition of Local Interconnection Trunk Group |
X |
||||
11 |
NIM 8 |
Definition of Points of Interconnection |
X |
||||
12 |
NIM 9 |
Mutual agreement necessary for interconnection |
X |
||||
13 |
NIM 11 |
OS/DA, 911, mass calling and meet-point trunk facilities within §251(c)(2) |
X |
||||
14 |
NIM 12 |
Single POI |
X |
||||
15 |
NIM 13 |
Pricing of leased facilities for interconnection |
X |
||||
16 |
NIM 14 |
Interconnection limitations/requirements |
X |
||||
17 |
NIM 15 |
Commingling local and other traffic |
X |
||||
18 |
NIM 17 |
Relative Use Factor |
X |
||||
19 |
NIM 20 |
911 interconnection pricing |
X |
||||
20 |
NIM 21 |
911 POI |
X |
||||
21 |
NIM 22 |
Inward operator assistance interconnection T&C |
X |
||||
22 |
NIM 23 |
Trunk forecasting detail |
X |
||||
23 |
NIM 24 |
Trunk traffic measurement |
X |
||||
24 |
NIM 25 |
Trunk augment provisioning interval |
X |
||||
25 |
NIM 26 |
Transit traffic |
X |
||||
26 |
NIM 28 |
Switched traffic that is PSTN-IP-PSTN or IP-PSTN |
X |
||||
LINE NO. |
ISSUE |
BRIEF DESCRIPTION |
OUTCOME | ||||
SBC |
MCI |
OTHER | |||||
CHAPTER 7 - Invoicing (INV) | |||||||
27 |
INV 1 |
Disputed amount payment withholding |
X |
||||
28 |
INV 2 |
Amounts disputed into escrow |
X |
||||
29 |
INV 3 |
Deadline for dispute documentation |
X |
||||
30 |
INV 4 |
Contractual stake date limits |
X |
||||
CHAPTER 8 - Operational Support Systems (OSS) | |||||||
31 |
OSS 1 |
Unauthorized use indemnity |
X |
||||
32 |
OSS 3 |
Inaccurate ordering or usage cost |
X |
||||
CHAPTER 9 - Performance Measures (PM) | |||||||
33 |
PM1 |
Reservation of rights to challenge a performance remedy plan |
X |
||||
CHAPTER 10 - Resale (Resale) | |||||||
34 |
Resale 1 |
Resale to 3rd carrier |
X |
||||
35 |
Resale 5 |
Resale liability & indemnity for 911 |
X |
||||
CHAPTER 11 - Digital Subscriber Line and Line Sharing (xDSL) | |||||||
36 |
xDSL 2 |
xDSL liability and indemnity language |
X |
||||
37 |
xDSL 3 |
Time & materials charges in ICA or tariff |
X |
||||
38 |
xDSL 5 |
Acceptance and Cooperative Testing; Rates in ICA or tariff |
X |
||||
CHAPTER 12 - Reciprocal Compensation (RC) | |||||||
39 |
RC 2 |
NPA NXX used to rate calls |
X |
||||
40 |
RC 4 |
Intercarrier compensation for FX and FX-like calls |
X |
||||
41 |
RC 5 |
FX traffic segregation |
X |
||||
42 |
RC 6 |
Traffic excluded from § 251(b)(5) scope |
X |
||||
43 |
RC 7 |
Rates for calls without CPN |
X |
||||
44 |
RC 8 |
Applicability of tandem interconnection rate |
X |
||||
45 |
RC 9 |
True-up mechanism for ISP bound traffic |
X |
||||
46 |
RC 13 |
Termination of intraLATA interexchange traffic |
X |
||||
47 |
RC 14 |
Special Access (dedicated private line) terms and conditions |
X |
||||
LINE NO. |
ISSUE |
BRIEF DESCRIPTION |
OUTCOME | ||
SBC |
MCI |
OTHER | |||
CHAPTER 12 (continued) | |||||
48 |
RC 15 |
Switched access traffic delivered over local interconnection trunk groups |
X |
||
49 |
RC 16 |
FCC NPRM on intercarrier compensation |
X |
||
50 |
RC 17 |
VOIP traffic compensation |
X |
||
51 |
RC 18 |
Transit traffic as part of this agreement |
X |
||
CHAPTER 13 - Unbundled Network Elements (UNE) | |||||
52 |
UNE 1 |
geographic limitations on providing UNEs |
X |
||
53 |
UNE 2 |
Lawful UNE definition |
X |
||
54 |
UNE 3 |
Transition when UNEs declassified |
X |
||
55 |
UNE 5 |
Separation of UNEs |
X |
||
56 |
UNE 6 |
Selling UNEs to other carriers |
X |
||
57 |
UNE 7 |
Purchases from tariff/UNE appendix sole vehicle |
X |
||
58 |
UNE 19 |
Tariff restrictions |
X |
||
59 |
UNE 24 |
SBC requirement to construct |
X | ||
60 |
UNE 40 |
Network reconfiguration in Appendix or tariff |
X |
||
CHAPTER 14 - Physical Collocation (Phy Co) | |||||
61 |
Phy Co 1 |
MCIm purchase from either ICA or tariff |
X |
||
62 |
Phy Co 2 |
Limitation of liability |
X | ||
63 |
Phy Co 3 |
Insurance requirement |
X |
||
64 |
Phy Co 5 |
Indemnification provision |
X |
||
65 |
Phy Co 6 |
Power metering |
X |
||
CHAPTER 15 - Virtual Collocation (Vir Co) | |||||
66 |
Vir Co 1 |
MCIm purchase from either ICA or tariff |
X |
||
67 |
Vir Co 3 |
Indemnification provision |
X |
||
68 |
Vir Co 5 |
Limitation of liability |
X |
||
69 |
Vir Co 6 |
Insurance requirement |
X |
||
LINE NO. |
ISSUE |
BRIEF DESCRIPTION |
OUTCOME | ||
SBC |
MCI |
OTHER | |||
CHAPTER 16 - Pricing Appendix (Pr App) | |||||
70 |
Pr App 2 |
Language re notice to adopting CLECs |
X | ||
71 |
Pr App 4 |
Products and services not in ICA |
X |
||
72 |
Pr App 7 |
SBC proposals re non recurring charges |
X |
||
CHAPTER 17 - Price Schedule (Pr Sch) | |||||
73 |
Pr Sch 24 |
NRC for OA/DA & BLV/I Trunk based on TELRIC or market prices |
X |
||
74 |
Pr Sch 25 |
Prices for Digital Cross Connect System and Network Reconfiguration services |
X |
||
75 |
Pr Sch 26 |
Recurring charges for diverse routing |
X |
||
76 |
Pr Sch 27 |
Price for NXX migration |
X |
||
77 |
Pr Sch 28 |
Rates for message exchange (ABS) |
X |
||
78 |
Pr Sch 31 |
Inclusion of rates for transit and transitting local traffic |
X |
||
79 |
Pr Sch 44 |
Collocation elements and rates |
|
X | |
80 |
Pr Sch 50 |
Rates for additional engineering, additional labor and misc. services |
X |
||
Other Category:
1. GT&C 6: Adopt 2001 ICA language.
2. UNE 24: Adopt SBC-CA for §§ 9.2 and 15.3; adopt MCIm for § 20.1.19.
3. P. Collo 2: Adopt SBC-CA except §§ 3.1.2 and 3.1.4
4. Pr. App 2: Adopt SBC-CA except for last phrase in proposed § 1.9.1.
5. Pr. Sch 44: Adopt MCIm except (a) where no rate exists for an item in the Collocation Appendices that is desired by MCIm it will be treated pursuant to Pricing Appendix § 1.2 and (b) include 2001 ICA provisions that physical collocation rates are subject to true-up and virtual collocation rates are subject to change based on later Commission order.
Note regarding NIM 4, 8, 12 and Recip Comp 2, 4, 5, 6, 8, 9, 16: For this arbitration, these items are not ripe or moot. The existing 13-State Amendment shall control, subject to further process July l, 2007. MCIm's proposed language (if the issue was otherwise resolved here) is not adopted.
Note regarding UNE 2: The Final Arbitrator's Report (FAR) finds for MCIm. The Commission decision adopts additional clarifying language proposed by SBC-CA that is compatible with the decision reached in the FAR.
Note regarding Attachment A: This attachment is intended as a general summary to assist interested parties. If there is any conflict between the text in the FAR and this attachment, the text in the FAR controls the outcome. If there is any conflict between that result (as determined by the text in the FAR) and the Commission decision, the Commission decision controls the outcome.
(END OF ATTACHMENT A)