Rank 2: Programs included in this rank will have the potential to have a TRC B/C ratio greater than 1.0 and are likely to provide ex post load impacts close to the utilities' ex-ante estimates used in their cost effectiveness calculations. These programs could be integrated with CAISO's MRTU, but the current estimates of costs of such integration appear to be excessive.

Previous PageTop Of PageNext PageGo To First Page