Rank 3: Programs included in this rank will have the potential to have a TRC B/C ratio greater than 1.0 and are likely to provide ex-post load impacts close to the utilities' ex-ante estimates used in their cost effectiveness calculations, but could not be integrated with CAISO's MRTU because of the specific structure of the programs.