Daily Calendar
Friday, August 31, 2018
· Commission Ratesetting Deliberative Meetings
· Commissioner Committee Meetings
· Commissioner All-Party Meetings
· Other Public Meetings
· Petitions for Modification
· Advice Letters Submissions
· Filings
· Suspensions
· Protest
|
The Commission’s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. |
|
The CPUC encourages
all Californians to participate in its meetings, hearings, workshops, and
proceedings. We try to hold our public meetings only in places that are
wheelchair accessible and which can accommodate specialized equipment and
other services useful to people with disabilities. Please see the notice of
the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor’s Office at least three business days in advance of the meeting. Contact the Public Advisor’s Office by any one of the following: |
||
Email: public.advisor@cpuc.ca.gov |
FAX: 415-355-5404
(Attn.: Public Advisor) |
|
COMMISSION VOTING MEETINGS
September 13, 2018 |
9:30 am |
Commission Auditorium, San Francisco |
September 27, 2018 |
9:30 am |
State Personnel Board Auditorium 801 Capitol Mall Sacramento, CA 95814 |
October 11, 2018 |
9:30 am |
Commission Auditorium, San Francisco |
COMMISSION RATESETTING DELIBERATIVE MEETINGS
(Not Open to the Public)
Ratesetting
Deliberative Meeting dates are reserved as noted
but will only be held if there are ratesetting matters to be considered.
September 10, 2018 |
10:00 am |
Commission Room 5305, San Francisco |
September 24, 2018 |
10:00 am |
Commission Room 5305, San Francisco |
October 8, 2018 |
10:00 am |
Commission Room 5305, San Francisco |
COMMISSIONER COMMITTEE MEETINGS
October 10, 2018 |
9:30 am |
Commission Auditorium, San Francisco |
COMMISSIONER ALL-PARTY MEETINGS
A quorum of Commissioners may attend all-party meetings in ratesetting proceedings upon 10 days’ notice of the meeting in the Daily Calendar. Otherwise, all-party meetings are noticed directly to the parties and might not be posted here.
September 7, 2018 |
Commission Headquarters - Auditorium San Francisco CA 94102
At least one of the Commissioners will be participating from the Sacramento office. Therefore, pursuant to Government Code Section 11123(b)(1), NOTICE IS HEREBY GIVEN that a member of the Commission will participate by teleconference in the from the following publicly accessible location:
California Public Utilities Commission 300 Capitol Mall, 5th Floor Sacramento, CA 95814
For more information contact: Scott Mosbaugh, at scott.mosbaugh@cpuc.ca.gov , 415-703-4435
|
HEARING CALENDAR
Dates in parentheses following the word “also” are subject to change without notice. The assigned Commissioner’s name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.
(PHC) = Prehearing Conference |
(WS) = Workshop |
(OA) = Oral Argument |
(PPH) = Public Participation Hearing |
(STC) = Status Conference |
(CA) = Closing Argument |
(EH) = Evidentiary Hearing |
(L&M) = Law & Motion |
(CM) = Community Meeting |
|
|
08/31/18 |
A.18-06-014 (PHC) - In the Matter of the
Application of STAR & CRESCENT BOAT COMPANY, a California corporation,
doing business as FLAGSHIP CRUISES & EVENTS (VCC-63), For Authorization
For a Passenger Fare Increase on Its Vessel Common Carrier Service on San
Diego Bay Between the City of Coronado and the City of San Diego, |
|
|
09/04/18 |
(ECP) C.18-04-024 (PHC) - Richard Kasbeer,
Complainant, vs. California American Water Company (U210W), Defendant [ for
an Order that Complainant’s home qualifies for a ¾ inch meter size and for
rates consistent therewith retroactive to August 2017.], |
|
|
09/06/18 |
A.18-05-001, And Related Matters (EH) - Application
of Great Oaks Water Company (U162W) for an Order establishing its authorized
cost of capital for the period from July 1, 2019 through June 30, 2022, |
|
|
09/07/18 |
A.18-06-015 (PHC) - Application of Southern
California Edison Company (U338E) for Approval of its Charge Ready 2 Infrastructure
and Market Education Programs, |
|
|
09/07/18 |
A.18-07-013 (PHC) - Application of Pacific Gas and
Electric Company for Authorization to Establish the Diablo Canyon
Decommissioning Planning Cost Memorandum Account (U39E), |
|
|
09/04/18 |
A.15-05-002,
And Related Matters (WS) - Application of San Diego Gas & Electric
Company (U902M) for Review of its Safety Model Assessment Proceeding Pursuant
to Decision 14-12-025, Meeting Number: 715 290 693 |
|
|
09/10/18 |
A.18-03-003 (EH) - Application of San Diego Gas &
Electric Company (U902E) for Approval of its 2019 Electric Sales Forecast,
Effective on January 1, 2019, |
|
|
09/10/18 |
P.18-06-010 (PHC) - Petition to Adopt, Amend, or
Repeal a RegulationPursuant to Pub. Util. Code section 1708.5, |
|
|
09/11/18 |
R.17-10-010 (WS) - Order Instituting Rulemaking
Proceeding to Consider Amendments to General Order 95, |
|
|
09/11/18 |
I.18-05-012 (PHC) - Order Instituting Investigation
into Operations and Practices of Preferred Long Distance, Inc. to Determine Whether
Respondents Violated the Laws, Rules, and Regulations of this State governing
the manner in which California Consumers are switched from Telephone Carriers
and Billed for Telephone Products and Services (U5502C), |
|
|
09/17/18 |
A.17-10-004 (EH) - In the Matter of Application of
Foresthill Telephone Co. (U1009C) to Review Intrastate Rates and Charges,
Establish a New Intrastate Revenue Requirement and Rate Design, and Modify
Selected Rates, |
|
|
09/17/18 |
A.17-11-009 (EH) - Application of Pacific Gas and
Electric Company Proposing Cost of Service and Rates for Gas Transmission and
Storage Services for the Period 2019-2021. (U39G), |
|
|
09/18/18 |
A.15-08-027 (OA) - In the Matter of the Application
of NEXTERA ENERGY TRANSMISSION WEST, LLC for a Certificate of Public
Convenience and Necessity for the Suncrest Dynamic Reactive Power Support
Project, |
|
|
09/20/18 |
A.18-06-001 (EH) - Application of Pacific Gas and
Electric Company for Adoption of Electric Revenue Requirements and Rates
Associated with its 2019 Energy Resource Recovery Account (ERRA) and
Generation Non-Bypassable Charges Forecast and Greenhouse Gas Forecast
Revenue and Reconciliation. (U39E), |
|
|
10/01/18 |
A.17-12-006 (EH) - Application of
California-American Water Company (U210W), Rio Plaza Water Company, Inc.
(U319W), and John Chris Nickel, Sr., Trustee for the John C. Nickel Trust for
an Order Authorizing the Sale of all Shares of Rio Plaza Water Company, Inc.
to California-American Water Company and Approval of Related Matters, |
|
|
10/08/18 |
A.17-10-002 (PHC) - Application of Southern
California Gas Company (U904G) and San Diego Gas & Electric Company
(U902G) Regarding Feasibility of Incorporating Advanced Meter Data Into the
Core Balancing Process, |
|
|
10/10/18 |
C.17-08-003, And Related Matter (EH) - Pacific Bell
Telephone Co. d/b/a AT&T California (U1001C), Complainant, vs. TruConnect
Communications, Inc. f/k/a Telscape Communications, Inc. (U4380C) and Blue
Casa Telephone, LLC (U7222C), Defendants, [ for the sum of $751,337.93 for
unpaid charges for UNEs and resale services; and related relief.], |
|
|
10/10/18 |
A.18-05-001, And Related Matters (PPH) - Application
of Great Oaks Water Company (U162W) for an Order establishing its authorized
cost of capital for the period from July 1, 2019 through June 30, 2022, |
|
|
12/12/18 |
A.18-04-002, And Related Matter (EH) - In the
Matter of the Application of PACIFICORP (U901E), an Oregon Company, for an
Order Authorizing a General Rate Increase Effective January 1, 2019, |
|
|
OTHER PUBLIC MEETINGS
September 6, 2018 10am – 12pm |
Webcast Information: https://level4ventures.webex.com/level4ventures/j.php?MTID=e3ed9b7bdc3e8ae5b9720d07bc92da09e
Participant Call in: 1-415-655-0002 Participant Access code: 808 006 939 Contact Information: Ravinder Mangat, News & Outreach Office, email: ravinder.mangat@cpuc.ca.gov
More Information: http://cpuc.ca.gov/general.aspx?id=6442458729
|
September 11 , 2018 and September 12, 2018 |
Commission Headquarters – Auditorium San Francisco CA 94102
Webcast Information: www.adminmonitor.com/ca/cpuc/
More information: https://www.eventbrite.com/e/global-climate-action-summit-practitioner-workshops-tickets-47743208221 |
October 4, 2018 9 am- 4 pm |
Richmond Memorial Auditorium & Convention Center 403 Civic Center Plaza Richmond, CA 94804
More Information: http://www.cpuc.ca.gov/SupplierDiversity/
|
Public Meeting Notice: Deaf and Disabled Telecommunications Program (DDTP) - Equipment Program Advisory Committee (EPAC)
September 7, 2018 |
DDTP Main Office
Contact: Reina Vazquez, DDTP Committee Coordinator, (510) 302-1147, or by email at rvazquez@ddtp.org
|
NEW PROCEEDINGS - NONE
PETITIONS FOR MODIFICATION - NONE
DRAFT RESOLUTIONS
Issued for public comment. Comments are governed by Rule 14.5.
Draft Resolution No. |
E-4934 |
Meeting Date |
September 13, 2018 |
Subject Matter |
Approves San Diego Gas & Electric Company’s Advice Letter on Demonstration Project C Request for Offers Bidding Results Pursuant to Decision 17-02-007 and 17-06-012. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=221884842 |
Comments Due Date |
September 3, 2018 |
Serve comments on: |
Jose Aliaga-Caro at Jose.Aliaga-Caro@cpuc.ca.gov and Gabriel Petlin at Gabriel.petlin@cpuc.ca.gov |
Draft Resolution No. |
E-4941 |
Meeting Date |
September 13, 2018 |
Subject Matter |
Approves PG&E's filing on Distribution Resources Plan Demonstration Project C Request for Offer Results. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M222/K354/222354184.PDF |
Comments Due Date |
September 4, 2018 |
Serve comments on: |
Jose Aliaga-Caro at Jose.Aliaga-Caro@cpuc.ca.gov and Gabriel Petlin at Gabriel.petlin@cpuc.ca.gov |
Draft Resolution No. |
E-4946 |
Meeting Date |
September 13, 2018 |
Subject Matter |
Addresses administrative procedures implementing TOU period grandfathering proposals filed by PG&E, SCE, and SDG&E in compliance with D.17-01-006. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M221/K674/221674577.PDF |
Comments Due Date |
September 4, 2018 |
Serve comments on: |
Bridget Sieren-Smith at bss@cpuc.ca.gov and Paul Phillips at psp@cpuc.ca.gov |
Draft Resolution No. |
E-4951 |
Meeting Date |
September 13, 2018 |
Subject Matter |
This Draft Resolution addresses the proposals by SDG&E for demand charge research plans pursuant to D.17-08-030. Notice of this Draft has been sent to the service lists. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M221/K516/221516377.PDF |
Comments Due Date |
September 5, 2018 |
Serve comments on: |
Robert Levin at rl4@cpuc.ca.gov and Paul Phillips at psp@cpuc.ca.gov |
Draft Resolution No. |
L-569 |
Meeting Date |
September 13, 2018 |
Subject Matter |
As required by 49 U.S.C Sec. 5329(e)(3)(F), the Commission adopts this resolution to prohibit the receipt of any funds from the public transportation systems, public transit guideway systems, or rail public transit agencies by the Commission over which the Commission exercises safety oversight under Public Utilities Code Section 99152 and/or 49 U.S.C Sec. 5329. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=222383391 |
Comments Due Date |
September 4, 2018; Reply comments September 10, 2018. |
Serve comments on: |
Patrick Berdge, Principal Counsel, email: patrick.berdge@cpuc.ca.gov |
Draft Resolution No. |
SX-128 |
Meeting Date |
September 13, 2018 |
Subject Matter |
This resolution recommends to the California Transportation Commission for increasing funding under the California Public Utilities Code section 1231.1 to an amount of $3,750,000 to be set aside in fiscal year 2019-20 for maintaining automatic grade crossing protection devices. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=222385141 |
Comments Due Date |
September 5, 2018 |
Serve comments on: |
Draft Resolution No. |
W-5169 (Option C) |
Meeting Date |
September 13, 2018 |
Subject Matter |
This resolution authorizes San Gabriel Valley Water Company to amortize the under-collected balances in the Drought Lost Revenue Memorandum Accounts and the Drought Surcharge-Revenue Memorandum Accounts for Los Angeles and Fontana Divisions. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=220225515 |
Comments Due Date |
August 30, 2018 |
Serve comments on: |
California Public Utilities Commission Water Division 505 Van Ness Avenue San Francisco, CA 94102 |
Draft Resolution No. |
E-4943 |
Meeting Date |
September 27, 2018 |
Subject Matter |
Approval of San Diego Gas and Electric Company, Southern California Edison Company and Pacific Gas and Electric Company to open source cyber-security applications. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=224027882 |
Comments Due Date |
September 11, 2018 |
Serve comments on: |
David.Matusiak@cpuc.ca.gov or Cheryl.Cox@cpuc.ca.gov
|
Draft Resolution No. |
T-17625 |
Meeting Date |
September 27, 2018 |
Subject Matter |
Approval of AT&T California’s (U-1001-C) Advice Letter setting forth its annual fine and alternative proposal for mandatory corrective action for failing to meet required service quality performance standards in Year 2017 pursuant to General Order 133-D. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M224/K234/224234794.PDF |
Comments Due Date |
September 17, 2018 |
Serve comments on: |
Amin Nojan at an4@cpuc.ca.gov |
Draft Resolution No. |
E-4952 |
Meeting Date |
October 11, 2018 |
Subject Matter |
Approval of the Database for Energy-Efficient Resources updates for 2020 and revised version 2019 in Compliance with D.15-10-028, D.16-08-019, and Resolution E-4818. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=225049353 |
Comments Due Date |
September 18, 2018 |
Serve comments on: |
ADVICE LETTERS SUBMISSIONS
To inquire about filings, suspension or protest, call or email the Energy Division (415-703-1974 or email: EDTariffUnit@cpuc.ca.gov), Communications Division (415-703-3052) or Water Division (415-703-1133 or email: water.division@cpuc.ca.gov)
|
|
|
08/24/18 |
Telecom 162 |
AT&T Mobility Wireless Operations Holdings Inc., Compliance with D 18-08-004 (effective TBD) |
|
|
|
08/24/18 |
Telecom 340 |
Cellco Partnership, Cellco Partners dba Verizon Wireless' Response to CPUC's Decision 18-08-004 (effective TBD) |
|
|
|
08/24/18 |
Telecom 3 |
Etrali North America, LLC, Cancellation of Authority (effective TBD) |
|
|
|
08/24/18 |
Telecom 8 |
Golden Bear Broadband LLC, Bring CAB Contact Information Up to Date (effective TBD) |
|
|
|
08/24/18 |
Telecom 602 |
MCI Metro Access Transmission Services, Corp., MCImetro Access Transmission Services Corp. d/b/a/ Verizon Access Transmission Services Response to CPUC's Decision 18-08-004 (effective TBD) |
|
|
|
08/24/18 |
Telecom 32 |
Siskiyou Long Distance Company, Bring CAB Contact Information Up to Date (effective TBD) |
|
|
|
08/24/18 |
Telecom 420 |
The Siskiyou Telephone Company, Bring CAB Contact Information Up to Date (effective TBD) |
|
|
|
08/24/18 |
Telecom 1 |
Vesta Solutions, Inc, Correcting deficienciesof Original Tariff Filed w/ CLEC Certification (A. 18-03-013) (effective TBD) |
|
|
|
08/27/18 |
Energy 4007G |
Pacific Gas & Electric Company, September 2018 G-SUR Rate Change. (anticipated effective 09/01/18) |
|
|
|
08/27/18 |
Telecom 13 |
American Broadband and Telecommunications Company, Compliance with D.18-08-004 (disaster response) (effective TBD) |
|
|
|
08/27/18 |
Telecom 30 |
Boomerang Wireless, LLC, Submits Compliance Report (disaster response) (effective TBD) |
|
|
|
08/27/18 |
Telecom 12791 |
Frontier California Inc., Amendment no.2 to Interconnection Agreement (effective TBD) |
|
|
|
08/27/18 |
Telecom 121 |
Frontier Communications of the Southwest Inc., Amendment No. 1 to Interconnection Agreement (effective TBD) |
|
|
|
08/27/18 |
Telecom 601 |
MCI Metro Access Transmission Services, Corp., CEQA Quarterly Report (effective TBD) |
|
|
|
08/27/18 |
Telecom 8 |
Metropcs California, LLC, Tier I Advice let per D. 18-8-004 (effective TBD) |
|
|
|
08/27/18 |
Telecom 6 |
T-Mobile West LLC, Tier I Advice Letter per D. 18-08-004 (disaster response) (effective TBD) |
|
|
|
08/27/18 |
Telecom 25 |
Tracfone Wireless, Conpliance with Decision 18-08-004 (effective TBD) |
|
|
|
08/27/18 |
Telecom 26 |
Virgin Mobile USA, LP, Formal Notification by Virgin Mobile U.S.A.LP in Compliance with D. 18-08-004 (disaster response) (effective TBD) |
|
|
|
08/28/18 |
Water 31 |
Puresource Water, Inc., Update CAB Contact Information (anticipated effective 08/28/18) |
|
|
|
08/29/18 |
Energy 3153E-B |
San Diego Gas & Electric Company, Supplements A.L.No.3153E, SDG&E's Approach to Address Click-Through Performance Requirements Outlined in Resolution E-4868. (anticipated effective 12/22/17) |
|
|
|
08/29/18 |
Energy 40PLC |
Santa Fe Pacific Pipelines Ltd Partners, Revised Tariff Rates for ROW Surcharge, in Compliance with D.14-12-057. (effective TBD) |
|
|
|
08/29/18 |
Energy 3853E |
Southern California Edison Company, Establishment of Time-of-Use Rates for Commercial Electric Vehicle Charging and Modification to the Rule 1 Definition of Electric Vehicle in Compliance with D.18-05-040. (effective TBD) |
|
|
|
08/29/18 |
Water 35-W |
Mountain Mesa Water Company, File Revised Form 3 (anticipated effective 08/29/18) |
|
|
|
08/29/18 |
Water 331 |
Suburban Water Systems, Authorization to Establish A.18-05-004 Cost of Capital Memorandum Account per Prehearing Conference 08/17/2018 (anticipated effective 07/27/18) |
|
|
|
08/30/18 |
Water 18 |
Canada Woods Water Company, Update Language on Billing Statement (effective TBD) |
|
|
|
08/30/18 |
Water 16-S |
Canada Woods Water Company - Sewer, Update Language on Billing Statement (effective TBD) |
|
|
|
08/30/18 |
Water 19 |
Casmite Corporation, Update Language on Billing Statement (effective TBD) |
|
|
|
08/30/18 |
Water 96-W |
Erskine Creek Water Company, Updating Form No. 3 (anticipated effective 08/30/18) |
|
|
|
08/30/18 |
Water 25-S |
Rolling Green Utilities, Inc, Update Form 3 Bill and Message on Back (anticipated effective 08/30/18) |
|
|
|
08/30/18 |
Water 50 |
Yerba Buena Water Company, Update Language on Billing Statement (effective TBD) |
|
|
|
|
||
08/28/18 |
Energy 103E |
Liberty Utilities (CalPeco Electric) LLC. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/26/18. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
08/29/18 |
Energy 5351E |
Pacific Gas & Electric Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/26/18. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
08/29/18 |
Energy 3253E |
San Diego Gas & Electric Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/26/18. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
08/29/18 |
Energy 3255E |
San Diego Gas & Electric Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/26/18. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
08/29/18 |
Energy 3841E |
Southern California Edison Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/26/18. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
08/31/18 |
Water 1212 |
California American Water Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/28/18. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
OTHER NOTICES - NONE