Friday, January 11, 2019
· Commission Ratesetting Deliberative Meetings
· Commissioner Committee Meetings
· Commissioner All-Party Meetings
· Filings
· Suspensions
· Protest
· Resolution ALJ 176-3430 regarding ratification of preliminary determinations of category and notice of assignment is included in this calendar.
|
The Commission’s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. |
|
The CPUC encourages
all Californians to participate in its meetings, hearings, workshops, and
proceedings. We try to hold our public meetings only in places that are
wheelchair accessible and which can accommodate specialized equipment and
other services useful to people with disabilities. Please see the notice of
the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor’s Office at least three business days in advance of the meeting. Contact the Public Advisor’s Office by any one of the following: |
||
Email: public.advisor@cpuc.ca.gov |
FAX: 415-355-5404
(Attn.: Public Advisor) |
|
COMMISSION VOTING MEETINGS
January 10, 2019 |
9:30 am |
Commission Auditorium, San Francisco |
January 31, 2019 |
9:30am |
Sacramento CA |
February 21, 2019 |
9:30am |
Commission Auditorium, San Francisco |
COMMISSION RATESETTING DELIBERATIVE MEETINGS
(Not Open to the Public)
Ratesetting
Deliberative Meeting dates are reserved as noted
but will only be held if there are ratesetting matters to be considered.
January 28, 2019 |
10:00 am |
Commission Room 5305, San Francisco |
February 15, 2019 |
10:00 am |
Commission Room 5305, San Francisco |
March 11, 2019 |
10:00 am |
Commission Room 5305, San Francisco |
COMMISSIONER COMMITTEE MEETINGS
February 20, 2019 |
9:30 am |
Commission Auditorium, San Francisco |
March 27, 2019 |
9:30 am |
Commission Auditorium, San Francisco |
COMMISSIONER ALL-PARTY MEETINGS - NONE
A quorum of Commissioners may attend all-party meetings in ratesetting proceedings upon 10 days’ notice of the meeting in the Daily Calendar. Otherwise, all-party meetings are noticed directly to the parties and might not be posted here.
HEARING CALENDAR
Dates in parentheses following the word “also” are subject to change without notice. The assigned Commissioner’s name is listed next to the proceedings as matter of record; the assigned Commissioner may or may not be present at the hearing.
(PHC) = Prehearing Conference |
(WS) = Workshop |
(OA) = Oral Argument |
(PPH) = Public Participation Hearing |
(STC) = Status Conference |
(CA) = Closing Argument |
(EH) = Evidentiary Hearing |
(L&M) = Law & Motion |
(CM) = Community Meeting |
|
|
01/11/19 |
A.17-12-011, And Related Matters (EH) - Application
of Pacific Gas and Electric Company for Approval of its Residential Rate
Design Window Proposals, including to Implement a Residential Default
Time-Of-Use Rate along with a Menu of Residential Rate Options, followed by
addition of a Fixed Charge Component to Residential Rates (U39E), |
|
|
01/11/19 |
A.18-11-001 (PHC) - Application of PACIFIC GAS AND
ELECTRIC COMPANY to issue, sell, and deliver one or more series of Debt
Securities and to guarantee the obligations of others in respect of the
issuance of Debt Securities, the total aggregate principal amount of such
long-term indebtedness and guarantees not to exceed $6.1 billion; to execute
and deliver one or more indentures; to sell, lease, assign, mortgage, or
otherwise dispose of or encumber utility property; to issue, sell and deliver
in one or more series, cumulative Preferred Stock -- $25 Par Value, Preferred
Stock -- $100 Par Value, Preference Stock or any combination thereof; to
utilize various debt enhancement features; and enter into interest rate
hedges. (U39M), |
|
|
01/11/19 |
R.13-11-005 (WS) - Order Instituting Rulemaking
Concerning Energy Efficiency Rolling Portfolios, Policies, Programs, Evaluation,
and Related Issues, |
|
|
01/14/19 |
A.18-06-015 (WS) - Application of Southern
California Edison Company (U338E) for Approval of its Charge Ready 2
Infrastructure and Market Education Programs, More Info: https://apps.cpuc.ca.gov/apex/f?p=401:56:0::NO:RP,57,RIR:P5_ |
|
|
01/14/19 |
R.17-06-024 (STC) - Order Instituting Rulemaking
Evaluating the Commission’s 2010 Water Action Plan Objective of Achieving
Consistency between Class A Water Utilities’ Low-Income Rate Assistance
Programs, Providing Rate Assistance to All Low – Income Customers of
Investor-Owned Water Utilities, and Affordability, |
|
|
01/14/19 |
R.17-06-024 (WS) - Order Instituting Rulemaking
Evaluating the Commission’s 2010 Water Action Plan Objective of Achieving
Consistency between Class A Water Utilities’ Low-Income Rate Assistance
Programs, Providing Rate Assistance to All Low – Income Customers of
Investor-Owned Water Utilities, and Affordability, |
|
|
01/15/19 |
A.18-07-011, And Related Matter (PPH) - In the
Matter of the Joint Application of Sprint Communications Company L.P.
(U-5112) and T-Mobile USA, Inc., a Delaware Corporation, For Approval of
Transfer of Control of Sprint Communications Company L.P. Pursuant to
California Public Utilities Code Section 854(a), |
|
|
01/16/19 |
A.17-01-012, And Related Matters (WS) - Application
of Pacific Gas and Electric Company (U39E) for Approval of Demand Response
Programs, Pilots and Budgets for Program Years 2018-2022, |
|
|
01/16/19 |
A.18-11-010 (PHC) - Application of Southern
California Gas Company (U904G) and San Diego Gas & Electric Company
(U902G) for Review of Costs Incurred in Executing Pipeline Safety Enhancement
Plan, |
|
|
01/16/19 |
A.18-05-013 (PHC) - Application of Jive Communications,
Inc. for Registration as an Interexchange Carrier Telephone Corporation
pursuant to the Provisions of Public Utilities Code Section 1013, |
|
|
01/16/19 |
A.18-07-011, And Related Matter (PPH) - In the
Matter of the Joint Application of Sprint Communications Company L.P.
(U-5112) and T-Mobile USA, Inc., a Delaware Corporation, For Approval of
Transfer of Control of Sprint Communications Company L.P. Pursuant to
California Public Utilities Code Section 854(a), |
|
|
01/17/19 4:00 p.m. |
R.15-01-008 (WS) - Order Instituting Rulemaking to
Adopt Rules and Procedures Governing Commission-Regulated Natural Gas
Pipelines and Facilities to Reduce Natural Gas Leakage Consistent with Senate
Bill 1371, Participant Code: 1682922 |
|
|
01/17/19 |
A.18-11-005 (PHC) - Application of SOUTHERN
CALIFORNIA GAS COMPANY (U904G) to Establish a Demand Response Program, |
|
|
01/17/19 |
A.18-07-011, And Related Matter (PPH) - In the
Matter of the Joint Application of Sprint Communications Company L.P.
(U-5112) and T-Mobile USA, Inc., a Delaware Corporation, For Approval of
Transfer of Control of Sprint Communications Company L.P. Pursuant to
California Public Utilities Code Section 854(a), |
|
|
01/18/19 |
A.18-09-009 (PHC) - Application of the Metro Gold
Line Foothill Extension Construction Authority for an order authorizing
construction of two grade separated light rail tracks, and alteration of one
freight track, at two (2) crossings at (1) Bonita Avenue & Cataract
Avenue, and (2) Monte Vista Avenue in the City of San Dimas in Los Angeles
County, California, |
|
|
01/22/19 |
R.18-07-006 (WS) - Order
Instituting Rulemaking to Establish a Framework and Processes for Assessing
the Affordability of Utility Service, |
|
|
01/22/19 |
A.18-11-003 (PHC) - Application for Approval of
Pacific Gas and Electric Company’s Commercial Electric Vehicle Rate. (U39E), |
|
|
01/22/19 |
C.18-11-012 (PHC) - Brookview MHP Investors, LLC,
dba Thunderbird Mobile Home Park, Complainant, vs. Pacific Gas and Electric
Company (U39E), Defendant [for Relief from violations of Mobilehome Park (MHP)
Utility Upgrade Agreement.], |
|
|
01/23/19 |
A.18-03-016 (EH) - Application of Southern
California Edison Company (U338E) for a Commission Finding that its
Procurement-Related and Other Operations for the Record Period January 1
Through December 31, 2017 Complied with its Adopted Procurement Plan; for
Verification of its Entries in the Energy Resource Recovery Account and Other
Regulatory Accounts; for Refund of $36.208 Million Recorded in Three
Accounts; and Review of Proposal to Return $17.644 million in Unspent Demand
Response Funds to Customers, |
|
|
01/24/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
01/25/19 |
A.18-12-009 (WS) - Application of Pacific Gas and
Electric Company for Authority, Among Other Things, to Increase Rates and
Charges for Electric and Gas Service Effective on January 1, 2020. (U39M), Meeting Number: 710 109 807 |
|
|
01/28/19 |
A.18-06-015 (EH) - Application of Southern
California Edison Company (U338E) for Approval of its Charge Ready 2
Infrastructure and Market Education Programs, |
|
|
01/28/19 |
I.18-05-012 (EH) - Order Instituting Investigation
into Operations and Practices of Preferred Long Distance, Inc. to Determine
Whether Respondents Violated the Laws, Rules, and Regulations of this State
governing the manner in which California Consumers are switched from
Telephone Carriers and Billed for Telephone Products and Services (U5502C), |
|
|
01/29/19 |
C.18-11-011 (PHC) - American Messaging Services,
LLC (U-2157-C), Complainant v. Pacific Bell Telephone Co. d/b/a AT&T
California (U-1001-C), Defendant [ for Relief from Breach of the parties’
Interconnection Agreement.], |
|
|
02/04/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/05/19 |
A.18-07-011, And Related Matter (EH) - In the
Matter of the Joint Application of Sprint Communications Company L.P.
(U-5112) and T-Mobile USA, Inc., a Delaware Corporation, For Approval of
Transfer of Control of Sprint Communications Company L.P. Pursuant to
California Public Utilities Code Section 854(a), |
|
|
02/05/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/06/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/07/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California corporation,
for an order (1) authorizing it to increase rates for water service by
$50,673,500 or 7.6% in test year 2020, (2) authorizing it to increase rates
on January 1, 2021 by $31,461,900 or 4.4% and on January 1, 2022 $33,000,700
or 4.4% in accordance with the Rate Case Plan, and (3) adopting other related
rulings and relief necessary to implement the Commission’s ratemaking
policies, |
|
|
02/11/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/12/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/13/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/14/19 11:00 a.m. ALJ Rizzo Comr Rechtschaffen |
C.18-12-004 (PHC) - Southern California Public Power Authority, Complainant, vs Southern California Gas Company (U904E), Defendant [For overbilling the customer.], Junipero Serra State Building – Hearing Room, 320 West 4th Street, Los Angeles, CA 90013 |
|
|
02/14/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/19/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/20/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/25/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/26/19 |
R.18-10-007 (PHC) - Order Instituting Rulemaking to
Implement Electric Utility Wildfire Mitigation Plans Pursuant to Senate Bill
901 (2018), |
|
|
03/18/19 |
K.18-10-001 (EH) - TC Telephone, L.L.C. (U6875C)
Appeal of Citation 1308-1426 issued by the Consumer Protection and
Enforcement Division, |
|
|
05/20/19 |
C.18-09-012 (EH) - University Village Thousand Oaks
CCRC LLC, Complainant vs California American Water Company (U210W),
Defendant. [For overbilling customer], |
|
|
08/06/19 |
A.15-04-013 (EH) - In the Matter of the Application
of Southern California Edison Company (U338E) for a Certificate of Public
Convenience and Necessity for the RTRP Transmission Project, |
|
|
OTHER PUBLIC MEETINGS
January 11, 2019 11:00 am
|
California Energy Commission 1516 Ninth Street First Floor, Art Rosenfeld Hearing Room Sacramento CA
Call In Information :(866) 469-3239 Participant password: 921 787 731
Webcast Information: https://energy.webex.com/energy/onstage/g.php?MTID=edf3afe6c02bb1263e10b53778d090202
More information: https://www.energy.ca.gov/calendar/index.php?eID=3264 |
January 11, 2019 10 am – 4 pm
|
DDTP Headquarters – Large Conference Room 2101 Webster Street, Suite 600 Oakland CA 94612
Contact: Reina Vazquez at 510-302-1147 or via e-mail at rvazquez@ddtp.org
More Information: http://ddtp.cpuc.ca.gov/News.aspx |
January 14, 2019 10 am – 4 pm
|
Marin Clean Energy 2300 Clayton Road #11 Floor Suite 1150 Concord CA 94529
Call-In Information: (562) 247-8421 Webcast:https://register.gotowebinar.com/register/8201502818237222657
Contact Elizabeth Baires at EBaries@semprautilities.com or Jessica Allison at jessica.allison@cpuc.ca.gov |
March 20, 2019 8 am – 5 pm |
Contact Information: firetechsummit@cpuc.ca.gov
More Information: http://firetechsummit.cpuc.ca.gov |
March 21, 2019 8 am – 12pm |
Contact Information: firetechsummit@cpuc.ca.gov
More Information: http://firetechsummit.cpuc.ca.gov |
NEW PROCEEDINGS
01-08-2019 |
A.19-01-004 - Application of the Los Angeles World Airports for an Order authorizing Construction of a grade separated structure for commuter rail tracks over the following crossings: Sepulveda Boulevard, Century Boulevard, 98th Street, 96th Street, Airport Boulevard and Aviation Boulevard. |
|
|
01-09-2019 |
A.19-01-005 - Application of the City of San Luis Obispo, herein sometimes referred to as “City” for an order authorizing the Construction of the Railroad Safety Trail Overpass Grade Separation Project (MP 247.80) over the Union Pacific Railroad (UP) in the City of San Luis Obispo. |
|
|
01-10-2019 |
R.19-01-006 - Order Instituting Rulemaking to Implement Public Utilities Code Section 451.2 Regarding Criteria and Methodology for Wildfire Cost Recovery Pursuant to Senate Bill 901 (2018). |
|
|
PETITIONS FOR MODIFICATION
01-10-2019 |
A.16-12-014 - Application of Santa Barbara County for authority to construct a pedestrian at-grade rail crossing, Santa Claus Lane, at Mile Post 375.96, Union Pacific Railroad Santa Barbara Subdivision, proposed CPUC Number, 001E-375.96-D; USDOT 450433W.[Amended Petition for Modification of Decision 18-02-005.] |
|
|
DRAFT RESOLUTIONS
Issued for public comment. Comments are governed by Rule 14.5.
Draft Resolution No. |
E-4965 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Southern California Edison requests a Commission ruling on the correct treatment for deferred tax amounts not historically included within the revenue requirement. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=251987264 |
Comments Due Date |
January 9, 2019 |
Serve comments on: |
Draft Resolution No. |
E-4967 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Summary of Southern California Edison’s SB 350 Standard Review Medium- and Heavy-Duty Vehicle Charging Infrastructure Program Budget Authorized Pursuant to Decision 18-05-040. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=250881432 |
Comments Due Date |
January 7, 2019 |
Serve comments on: |
Draft Resolution No. |
E-4977 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Commission Motion Amending the Bioenergy Renewable Auction Mechanism (BioRAM) Program and Authorizing the Extension of Certain Contracts pursuant to Senate Bill 901. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=252568675 |
Comments Due Date |
January 11, 2019 |
Serve comments on: |
Draft Resolution No. |
G-3543 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Pacific Gas and Electric Company seeks approval of a one-time deviation to the indemnity clause of Form 62-4527 to perform work requested by the University of California Davis. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=250575292 |
Comments Due Date |
January 7, 2019 |
Serve comments on: |
Draft Resolution No. |
G-3546 |
Meeting Date |
January 31, 2019 |
Subject Matter |
The California Energy Commission requests approval of its 2018-2019 natural gas research budget. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=252033298 |
Comments Due Date |
January 10, 2019 |
Serve comments on: |
Draft Resolution No. |
G-3547 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Rejection of Southern California Gas Company’s Request to Include Greenhouse Gas Costs into Rates and Issue the 2018 California Climate Credit. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=250233305 |
Comments Due Date |
January 3, 2019 |
Serve comments on: |
Draft Resolution No. |
L-575 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Authorizes Disclosure of Records of the California Public Utilities Commission’s Safety and Enforcement Division’s Investigation of an electrical incident that occurred on March 25, 2015 at S. Brawley Avenue, Fresno CA. . once the investigation is complete. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=249624227 |
Comments Due Date |
1/21/2019; Reply Comments 1/28/2019 |
Serve comments on: |
Garrett Toy and Annalissa Herbert |
Draft Resolution No. |
T-17635 |
Meeting Date |
January 31, 2019 |
Subject Matter |
T-17635 seeks to approve AT&T California’s request for a second deviation from Public Utilities Code § 320 to construct an additional 280 feet of overhead (aerial) fiber facilities along State Scenic Highway 1 in San Luis Obispo County. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M250/K859/250859096.PDF |
Comments Due Date |
January 17, 2019 |
Serve comments on: |
danny.tse@cpuc.ca.gov |
Draft Resolution No. |
T-17640 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Approves Cal.net, Inc. to be designated as an Eligible Telecommunications Carrier to obtain federal high-cost and federal Lifeline support. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M252/K563/252563199.PDF |
Comments Due Date |
January 14, 2019 |
Serve comments on: |
Draft Resolution No. |
T-17647 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Approves advice letters setting forth a fine for PAETEC Communications, LLC (U-6097-C) for failure to meet required service quality performance standards in Year 2017, pursuant to General Order 133-D. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M252/K793/252793694.PDF |
Comments Due Date |
January 16, 2019 |
Serve comments on: |
Draft Resolution No. |
E-4962 ALTERNATE |
Meeting Date |
February 21, 2019 |
Subject Matter |
Denies Southern California Edison Company’s (SCE’s) request for Commission approval of a new renewable power purchase agreement with Wistaria Solar, LLC (Wistaria). |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=257692502 |
Comments Due Date |
January 30, 2019 |
Serve comments on: |
ADVICE LETTERS SUBMISSIONS - NONE
To inquire about filings, suspension or protest, call or email the Energy Division (415-703-1974 or email: EDTariffUnit@cpuc.ca.gov), Communications Division (415-703-3052) or Water Division (415-703-1133 or email: water.division@cpuc.ca.gov)
OTHER NOTICES – NONE
RESOLUTION REGARDING RATIFICATION OF PRELIMINARY DETERMINATIONS OF CATEGORY
For purposes of Rule 9.2(c), notice of the assignment is the day the assignments associated with this preliminary categorization document appears in the Daily Calendar following the Commission business meeting.
(01/10/2019) |
ALJ 176-3430 |
Ratification of preliminary
determinations of category for proceedings initiated by application. The
preliminary determinations are pursuant to |
PRELIMINARY DETERMINATION SCHEDULES |
|
ASSIGNMENTS |
|||||||||
|
|
|
|||||||||
NUMBER
TITLE |
PROPOSED CATEGORY |
PRELIM. |
HEARING |
|
COMR |
ALJ |
|||||
|
|||||||||||
|
|||||||||||
A18-12-008 PACIFIC GAS AND ELECTRIC COMPANY, Application of Pacific Gas and Electric Company in the 2018 Nuclear Decommissioning Cost Triennial Proceeding. (U39E) |
Ratesetting |
Ratesetting |
YES |
|
Picker |
Houck |
|||||
|
|||||||||||
A18-12-009 PACIFIC GAS AND ELECTRIC COMPANY, Application of Pacific Gas and Electric Company for Authority, Among Other Things, to Increase Rates and Charges for Electric and Gas Service Effective on January 1, 2020. (U39M) |
Ratesetting |
Ratesetting |
YES |
|
Picker |
Lau/Lirag |
|||||
|
|||||||||||
|
||||||
A18-12-010 Cal-Ore Telephone Co., Calaveras Telephone Company, Ducor Telephone Company, Foresthill Telephone Co., Kerman Telephone Co., Pinnacles Telephone Co., Sierra Telephone Company, Inc., The Ponderosa Telephone Co., The Siskiyou Telephone Co., Volcano Telephone Company, Application of Calaveras Telephone Company (U1004C),Cal-Ore Telephone Co. (U1006C), Ducor Telephone Company (U1007C), Foresthill Telephone Co. (U1009C), Kerman Telephone Co. (U1012C), Pinnacles Telephone Co. (U1013C), The Ponderosa Telephone Co. (U1014C), Sierra Telephone Company, Inc. (U1016C, The Siskiyou Telephone Company (U101 C) and Volcano Telephone Company (U1019C) For Rehearing of Resolution T-17616. |
* |
* |
* |
|
Not Assigned |
Legal Division |
|
||||||
A18-12-011 City of Encinitas, dba Karen, Application of the City of Encinitas for authority to constrict a Pedestrian Underpass Crossing (Proposed C.P.U.C. Crossing No.106.237.10-BD) (Proposed DOT No.973261L) in the City of Encinitas, County of San Diego, California. |
Ratesetting |
Ratesetting |
YES |
|
Randolph |
Burcham |
|
||||||
A18-12-013 BCM One Group Holdings, Inc., BCM One, Inc., Thompson Street Capital Partners V, L.P., Joint Application of BCM One, Inc. (U6687C), on the one hand, and BCM One Group Holdings, Inc. and Thompson Street Capital Partners V, L.P., on the other hand, for Approval of the Transfer of Control of BCM One, Inc. Pursuant to Public Utilities Code Section 854. |
Ratesetting |
Ratesetting |
YES |
|
Randolph |
Zhang |
|
||||||
A18-12-014 Cal Advocates/LEE/CPUC, Application for Rehearing of Resolution E-4949. |
* |
* |
* |
|
Not Assigned |
Legal Division |
|
||||||
A18-12-015 LIBERTY UTILITIES (PARK WATER) CORP, In the Matter of the Application of Liberty Utilities (Park Water) Corp. (U314W) for Authority to Issue Evidence of Indebtedness and Other Related Requests. |
Ratesetting |
Ratesetting |
YES |
|
Picker |
Burcham |
|
||||||
A18-12-016 NEET Investment Acquisition LP, LLC, NextEra Energy Transmission Investments, LLC, NextEra Energy Transmission, LLC, SteelRiver Infrastructure Associates LLC, SteelRiver SLP LLC, TBAIV II Feeder LLC, Trans Bay Cable LLC, Application of Trans Bay Cable LLC (U934E), SteelRiver Infrastructure Associates LLC, SteelRiver SLP LLC, TBAIV II Feeder LLC, NextEra Energy Transmission, LLC, NextEra Energy Transmission Investments, LLC, and NEET Investment Acquisition LP, LLC for Authority to Sell and Transfer Indirect Control of Trans Bay Cable LLC to NextEra Energy Transmission, LLC. |
Ratesetting |
Ratesetting |
YES |
|
Rechtschaffen |
Jungreis |
|
|
||||||
A18-12-017 PACIFIC GAS AND ELECTRIC COMPANY, Application of Pacific Gas and Electric Company to Describe Cost Allocation Principles Pursuant to Resolution E-4886. (U39E) |
Ratesetting |
Ratesetting |
YES |
|
Picker |
Kao |
|
||||||
A18-12-019 Bear Valley Electric Service, Inc., Golden State Water Company, Golden State Water Company on Behalf of its Bear Valley Electric Service Division (U913E), In the matter of the Application of GOLDEN STATE WATER COMPANY (U133W), GOLDEN STATE WATER COMPANY on behalf of its BEAR VALLEY ELECTRIC SERVICE DIVISION (U 913 E) and BEAR VALLEY ELECTRIC SERVICE, INC. for authority to implement a corporate reorganization plan that will transfer the electric utility operations of Bear Valley Electric Service Division to Bear Valley Electric Service, Inc. |
Ratesetting |
Ratesetting |
YES |
|
Randolph |
Bemesderfer |
|
|
||||||
A19-01-001 San Gabriel Valley Water Company, Application of SAN GABRIEL VALLEY WATER COMPANY (U337W) for Authority to Increase Rates Charged for Water Service in its Los Angeles County Division by $4,099,800 or 5.5% in July 2020, $6,594,500 or 8.4% in July 2021, and $3,927,000 or 4.6% in July 2022, and in its Fontana Water Company division by $9,626,900 or 14.0% in July 2020, $4,979,800 or 6.2% in July 2021, and $3,054,100 or 3.6% in July 2022, and related relief. |
Ratesetting |
Ratesetting |
YES |
|
Rechtschaffen |
Fortune |
*Application for Rehearing of Resolution is assigned to Legal Division. Categorization/Need for Hearing will be addressed as necessary if the Commission subsequently grants rehearing.