D0909026 Adopting Cost-Benefit Methodology for Distributed Generation
Word Document PDF Document

1 The RIM test is not a required DG cost-benefit test, but it is shown here in the event it is performed for other purposes.

2 Market transformation is not listed in the tables that follow as an input variable with specific data sources because market transformation effects will be analyzed qualitatively after a first set of cost-benefit tests are conducted. See Section 5.7 of this decision where a methodology for market transformation assessment is discussed, based on the Itron Solar Cost Report and an E3 draft methodology.

3 The RIM Test is not a required DG cost-benefit test.

4 To the extent standby charge exemptions are already captured as reduced T&D and non-fuel generation revenues, they should not be counted twice.