All applications shall state clearly and concisely the authorization or relief sought; shall cite by appropriate reference the statutory provision or other authority under which Commission authorization or relief is sought; and, in addition to specific requirements for particular types of applications (see Rules 18 through 41), shall state the following:
(a) The exact legal name of each applicant and the location of principal place of business, and if an applicant is a corporation, trust, association, or other organized group, the State under the laws of which such applicant was created or organized.
(b) The name, title, address and telephone number of the person to whom correspondence or communications in regard to the application are to be addressed. Notices, orders and other papers may be served upon the person so named, and such service shall be deemed to be service upon applicant.
(c) Such additional information as may be required by the Commission in a particular proceeding.
(d) Applications for ex parte action shall set forth the basis for such request, and those seeking the granting of relief pending full hearing shall set forth the necessity for such relief.
(e) In addition to otherwise complying with these rules, each application for authority to abandon passenger stage service, or reduce service to less than one trip per day (excluding Saturday and Sunday), shall include the following exhibits:
NOTE: If more than one point, route, or route segment is included in the application, the indicated data are to be separately stated for each point, route, or route segment.
Exhibit 1. Points and Routes Affected - a listing of points, routes, and route segments to be abandoned, including identification and a brief description of any other passenger transportation service available at the points or along the routes affected.
Exhibit 2. Maps - maps to scale showing each point, route, and route segment to be abandoned.
Exhibit 3. Timetables - copies of current and proposed timetables covering the affected points and routes.
Exhibit 4. Authority - copies of current and proposed certificate authorities covering the affected points and routes.
Exhibit 5. Traffic - traffic data for a recent representative period, showing numbers of interstate and intrastate passengers (by classification if more than one type of ticket is sold) destined to and originating from each point to be abandoned; also package express shipments similarly stated.
Exhibit 6. Fares and Rates - description of the fares and rates applicable to the affected services.
Exhibit 7. Revenues - calculation of the annual interstate and intrastate passenger, express, and other revenues which accrue as a result of the service to be abandoned, along with an explanation of how the revenues were calculated and of any assumptions underlying the calculations.
Exhibit 8. Operating Statistics - calculations of route miles, annual bus miles, and schedule operating time to be eliminated for each point, route, or route segment to be abandoned.
Exhibit 9. Expenses - calculation in the Uniform System of Accounts for Common and Contract Motor Carriers of Passengers, of the variable costs of operating each affected service, with an explanation of how the costs were calculated, and of any assumptions underlying the calculations (assumptions should be consistent with those used to calculate revenues). Any labor costs included shall also be separately identified and described.
Exhibit 10. Financial Assistance - description of any present operating subsidies or financial assistance applicable to the affected service, including identification of source, amounts, duration, and any significant terms or conditions applicable; also description of any proposals or discussions with respect to operating subsidies or financial assistance which have occurred during the year preceding the filing of the application.
Exhibit 11. Additional Evidence - any additional evidence or legal argument applicant believes to be relevant to the application.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 454, 818, 851, 852, 1001-1011, 1031 and 1063, Public Utilities Code.
Notice requirements for specific applications and other pleadings are contained in the applicable Rules. However, the Commission's Daily Calendar (available from the Commission's Documents Office in San Francisco) will publish notice of applications filed. Publication in the Daily Calendar constitutes notice of filing to potentially affected competitors, customers, and interested parties for the following applications:
(a) Applications for any highway common carrier, cement carrier, cement contract carrier, dump truck carrier, express corporation, or freight forwarder for operating authority, or to transfer control under Public Utilities Code Section 854.
(b) Applications or other filings to increase, reduce, or adjust rates of highway carriers, railroads, express corporations, freight forwarders, or pipelines (except deviations from established minimum rates; see Rule 42.1).
(c) Applications for passenger stage corporation or vessel operating authority, to extend or transfer operating authority, or to transfer control under Public Utilities Code Section 854.
(d) Applications for charter-party carrier certificates, or to extend and/or modify such certificates, or to transfer such certificates.
The Daily Calendar will list the applicant's address and telephone number when listing the above applications. Applicants shall furnish or mail a copy of the application or filing to any person making a request, or to any other persons as the Commission may direct.
Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Sections 452, 454(b), 854, 1010, 1032, 3662, 5191, 5372 and 5377.1, Public Utilities Code. |
(a) If applicant is a domestic corporation, as defined by Section 167 of the Corporations Code, a copy of its current articles of incorporation, certified by the California Secretary of State, shall be annexed to the original of the application, but need not be annexed to copies of the application. If a corporate applicant is not a domestic corporation, as so defined, a properly certified current copy of its articles of incorporation, and a copy of its certificate of qualification to transact intrastate business certified by the California Secretary of State, shall be annexed to the original of the application, but need not be annexed to copies of the application. If current articles or certificates of qualification have already been filed, the application need only make a specific reference to such filings.
(b) If applicant is a partnership, a copy of its current partnership agreement shall be annexed to the original application, but need not be annexed to copies of the application. If a current partnership agreement has already been filed, the application need only make specific reference to such filing. In lieu of filing the partnership agreement, applicant may file a current statement of partnership recorded pursuant to Section 15010.5 of the Corporations Code, or a current certificate of limited partnership recorded pursuant to Section 15502 of the Corporations Code, as appropriate.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 167 and 15010.5, Corporations Code.
Wherever these rules provide that a financial statement shall be annexed to the application, such statement, unless otherwise provided herein, shall be prepared as of the latest available date, and shall show the following information:
(a) Amount and kinds of stock authorized by articles of incorporation and amount outstanding.
(b) Terms of preference of preferred stock, whether cumulative or participating, or on dividends or assets, or otherwise.
(c) Brief description of each security agreement, mortgage and deed of trust upon applicant's property, showing date of execution, debtor and secured party, mortgagor and mortgagee and trustor and beneficiary, amount of indebtedness authorized to be secured thereby, and amount of indebtedness actually secured, together with any sinking fund provisions.
(d) Amount of bonds authorized and issued, giving name of the public utility which issued same, describing each class separately, and giving date of issue, par value, rate of interest, date of maturity and how secured, together with amount of interest paid thereon during the last fiscal year.
(e) Each note outstanding, giving date of issue, amount, date of maturity, rate of interest, in whose favor, together with amount of interest paid thereon during the last fiscal year.
(f) Other indebtedness, giving same by classes and describing security, if any, with a brief statement of the devolution or assumption of any portion of such indebtedness upon or by any person or corporation if the original liability has been transferred, together with amount of interest paid thereon during the last fiscal year.
(g) Rate and amount of dividends paid during the five previous fiscal years, and the amount of capital stock on which dividends were paid each year.
(h) A balance sheet as of the latest available date, together with an income statement covering period from close of last year for which an annual report has been filed with the Commission to the date of the balance sheet attached to the application.
(a) General. This rule has been developed and adopted pursuant to the California Environmental Quality Act of 1970, Public Resources Code Sections 21000 et seq. (CEQA), and the guidelines for implementation of CEQA promulgated by the Office of the Secretary for Resources, California Administrative Code Sections 15000 et seq. (EIR Guidelines.) The Commission hereby adopts and shall adhere to the principles, objectives, definitions, criteria and procedures of CEQA, the EIR Guidelines, and the additional provisions of this rule.
(b) Objectives.
(1) To carry out the legislative intent expressed in CEQA, Public Resources Code Sections 21000 and 21001, and specifically:
(2) To ensure that environmental issues are thoroughly, expertly, and objectively considered within a reasonable period of time, so that environmental costs and benefits will assume their proper and co-equal place beside the economic, social, and technological issues before the Commission, and so that there will not be undue delays in the Commission's decision-making process.
(3) To assess in detail, as early as possible, the potential environmental impact of a project in order that adverse effects are avoided, alternatives are investigated, and environmental quality is restored or enhanced, to the fullest extent possible.
(4) To achieve an appropriate accommodation between these procedures and the Commission's existing planning, review, and decision-making process.
(c) Applicability. This rule shall apply to CEQA projects for which Commission approval is required by law, except projects for which an application must be filed with the California Energy Resources Conservation and Development Commission pursuant to Public Resources Code Section 25500.
(d) Proponent's Environmental Assessment. The proponent of any project subject to this rule shall include with the application for such project an environmental assessment which shall be referred to as the Proponent's Environmental Assessment (PEA). The PEA shall be employed by the Commission to quickly focus on any impacts of the project which may be of concern, and may be used as an aid in preparing the Commission's Initial Study to determine whether to prepare a Negative Declaration or an Environmental Impact Report. Where it is found that CEQA requires such analysis and documentation the PEA may be employed in the preparation thereof.
(1) Form and Content. If it can be seen with certainty that there is no possibility that the project in question may have a significant adverse effect on the environment, the project PEA should be limited to a statement of this conclusion and any additional explanation or information which may be necessary for an independent assessment of such issue by the Commission. If it cannot be seen with certainty that there is no possibility that the project in question may have a significant adverse effect on the environment, then the PEA shall include all information and studies required by the Commission Information and Criteria List applicable to the project, and shall be submitted in the format specified in such list.
(2) Filing. The PEA shall be filed, consistent with Rule 2.5, as a separate exhibit accompanying the application or pleading. It need not be physically attached thereto.
(3) Commission Information and Criteria Lists. The Commission shall adopt and revise as necessary a list specifying in detail the information and studies which will be required from proponents of projects subject to this rule. These information lists shall also contain criteria which the Commission will apply in order to determine the completeness of PEAs. These lists shall be contained within the Commission's Information and Criteria List adopted pursuant to Chapter 1200 of the Statutes of 1977 (Government Code Sections 65940 through 65942), and shall be made available to the public upon request from Commission staff.
(e) Motions. Appropriate motions may be made in any proceeding subject to this rule.
(1) Such Motions include but are not limited to:
(A) Motion for determination of whether the Commission is the Lead Agency for purposes of CEQA and this rule;
(B) Motion for determination of who is the proponent of the project at issue;
(C) Motion for a public hearing under subsection (g);
(D) Motion for an expedited hearing under subsection (g) (2);
(E) Motion for the determination of the reasonableness of the deposit or fee required under subsection (j).
(2) A motion for determination of whether the proceeding involves a project subject to or exempt from CEQA and this rule may be made pursuant to Rule 17.2.
(3) A motion made under this subsection filed in a proceeding seeking ex parte action or prior to hearing in other proceedings shall be served upon all parties upon which service of the application, complaint, order instituting investigation, or other order was made or required to be made. If a motion is made during the course of a hearing, it shall be served on all parties of record.
(4) The Commission staff and all other parties upon whom the motion is required to be served shall have 10 calendar days in which to respond unless the presiding officer or Administrative Law Judge for good cause shown otherwise orders.
(f) Preparation of Environmental Documents. The procedures for preparation of environmental documents required under CEQA and the EIR Guidelines shall be as prescribed in CEQA, the EIR Guidelines, and the additional provisions of this rule.
(1) Negative Declarations.
(A) Notice of the preparation of a Negative Declaration shall be given by direct mail to all organizations and individuals having previously requested such notice, and to owners of land, under, or on which the project may be located, and owners of land adjacent thereto. Notice shall also be given to the general public by advertisement, not less than once a week, two weeks successively in a newspaper or newspapers of general circulation in the county or counties in which the project will be located.
(B) Negative Declarations shall be completed and adopted within 105 days of the date on which the project application is accepted as complete.
(C) Negative Declarations shall be available for public comment not less than 30 days prior to project approval should the project be approved.
(2) Draft EIRs.
(A) The PEA reviewed, corrected, amended and independently evaluated and analyzed by the staff may become the Commission's Draft EIR.
(B) Notice of Completion of the Draft EIR shall be given by direct mail to the county and municipal planning commissions and the county and municipal legislative bodies for each county or city affected by the project, the state highway engineer, other organizations and individuals having previously requested notification, and to owners of land under, or on which the project may be located, and owners of land adjacent thereto. Notice shall also be given to the general public by advertisement, not less than once a week, two weeks successively in a newspaper or newspapers of general circulation in the county or counties in which the project will be located.
(3) Final EIRs.
(A) Final EIRs shall be completed and certified within one year of the date on which the project application is accepted as complete.
(B) Copies of the Final EIR shall be served upon all parties to the proceeding.
(4) Public Availability of Environmental Documents. Copies of PEAs, Initial Studies, Negative Declarations, Draft EIRs, Final EIRs, and any other public environmental documents shall be available to members of the public who may be charged their actual cost of reproduction and handling.
(5) Extensions of Time. Consistent with the intent and purposes of CEQA, and Chapter 1200 Statutes 1977 (Government Code Sections 65920 et seq.), and to the extent permitted by CEQA, Chapter 1200, and the EIR Guidelines, reasonable extensions of time periods specified in CEQA, Chapter 1200, the EIR Guidelines, and in this rule may be granted. Such extensions include extensions of time periods specified in subsections (f)(1)(B) and (f)(3) of this rule.
(g) Hearings. Unless the Commission, presiding officer or Administrative Law Judge by order otherwise provides, public hearings shall be held upon each Negative Declaration and each Draft EIR for which a protest or motion under subsection (e)(1)(C) or (e)(1)(D) of this rule is received.
(1) Ex Parte Proceedings. If no protest or motion under subsection (e) is received within 30 days following the notice of completion of the Draft EIR or the notice of preparation of the Negative Declaration, the Final EIR or Negative Declaration may be completed and certified or completed and adopted without public hearing.
(2) Expedited Hearings on Environmental Issues. Any public hearing held concerning environmental issues may by order of the Commission, the presiding officer, or Administrative Law Judge be expedited for the purpose of facilitating agency compliance with the time constraints imposed upon Commission application processing by Chapter 1200 Statutes 1977 (Government Code Sections 65950, 65951, and 65952) and Rules 17.1(f)(1)(B) and (f)(3) through the implementation of such procedures as may in the discretion of the Commission, the presiding officer or Administrative Law Judge be found necessary and appropriate. Such procedures may include but need not be limited to any, or any combination of the following:
(A) Limitations on the time allotted to each party;
(B) Limitations upon the scope of the issues and testimony;
(C) Limitation or elimination of cross-examination.
(3) Notice. Any public hearing held shall be held not less than 45 calendar days after the Draft EIR has been made available for public inspection and comment, and no less than 21 calendar days after the Negative Declaration has been made available.
(4) Evidence. Evidence in support of the project based upon the PEA shall be presented by the proponent at any hearing ordered by the Commission. All other parties may offer evidence in support of their environmental positions. Comments received through the consultation process shall be made a part of the record in the proceeding and shall be utilized to the maximum extent permissible under the Commission rules.
(h) Categorical Exemptions.
(1) The following specific projects are within the classes of projects which the Secretary for Resources has exempted from the EIR requirements of CEQA:
(A) Class 1 Exemptions.
1. Restoration and repair of existing structures when they have deteriorated or are damaged, in order to meet current standards of public health and safety under the rules of the Commission or other public authority, where the damage is not substantial and did not result from an environmental hazard.
2. The operation, repair, maintenance, or minor alteration of existing facilities used to convey or distribute electric power, natural gas, water, or other substance.
3. The maintenance of landscaping around utility facilities.
4. The maintenance of native growth around utility facilities.
5. Alteration in railroad crossing protection.
6. Minor railroad crossing alterations as described in Guidelines Section 15101 (c) and (f), including, but not limited to filings under General Order No. 88.
7. Installation of new railroad-highway signals or signs.
8. Abandonment, removal, or replacement of the following railroad facilities: (a) stock corrals, (b) tracks, or (c) platforms.
9. Deviation requests filed under General Orders Nos. 26-b and 118 as to clearances and walkways.
(B) Class 2 Exemptions.
1. The replacement or reconstruction, including reconductoring of existing utility structures and facilities where the new structure or facility will be located on the same site as the replaced structure or facility and will have substantially the same purpose and capacity as the structure replaced.
2. Minor reconstruction or repair of railroad crossings or separations.
(C) Class 3 Exemptions.
1. Stores and offices for utility purposes if designed for an occupant load of 20 persons or less, if not in conjunction with the building of two or more such structures.
2. Water main, sewage, electrical, gas, and other utility extensions of reasonable length to serve such construction.
3. Accessory (appurtenant) structures to utility structures including garages, carports, patios, and fences.
(D) Class 4 Exemptions. New gardening or landscaping in conjunction with utility facilities or structures not to include the removal of mature, scenic trees, the filling of earth into previously excavated land, with material compatible with the natural features of the site, and minor temporary uses of land having negligible or not permanent effect on the environment.
(E) Class 5 Exemptions. Projects which require the issuance of street opening permits to permit minor alterations in land use limitations.
(F) Class 6 Exemptions. The preparation and filing of basic data, research, experimental management, and resource evaluation activities which do not result in a serious or major disturbance to an environmental resource. This includes the filing of informational reports with the Commission.
(G) Class 7 Exemptions. Commission decision-making activities which are intended to assure the maintenance, restoration, or enhancement of a natural resource, where procedures for the protection of the environment have been included.
(H) Class 8 Exemptions. Commission decision-making activities if they consist of action taken to assure the maintenance, restoration, enhancement, or protection of the environment, such as, in connection with the issuance of instructions or orders having to do with existing utility facilities, where procedures for the protection of the environment have been included. Construction activities are not included in this exemption.
(I) Class 21 Exemptions. Commission activities which consist of enforcing or revoking a lease, permit, certificate or other entitlement which activities do not ordinarily involve significant effects on the environment.
(i) Lead Agency Determinations.
(1) The Commission is the lead agency for the following stationary utility projects:
(A) Electric transmission lines and generation plants under General Order No. 131-B, over which the Energy Resources Conservation and Development Commission does not have primary jurisdiction.
(B) Gas storage facilities and major gas transmission lines.
(C) New and noncontiguous utility facility projects (independent of subdivisions).
(D) Radiotelephone utility facilities.
(E) Telephone service area expansions.
(F) Proceedings directly related to new construction of utility facilities.
(G) Applications for exemptions from under grounding requirements, except where the electric or telephone distribution lines are incidental to a development project over which a city, county, or other political subdivision has the primary decision-making responsibility.
(2) The Commission is the lead agency in certification proceedings involving passenger stage and railroad corporations, passenger air and highway common carriers, Class B charter-party carriers of passengers, and vessels.
(3) The Commission is the lead agency for railroad projects involving a grade separation, new street crossing, new railroad track crossing, or railroad crossing relocation or widening project, except that where the project is to be carried out by a state or local public agency.
(j) Fees for Recovery of Costs Incurred in Preparing EIRs.
(1) For any project where the Commission is the lead agency responsible for preparing the EIR to Negative Declaration the proponent shall be charged a fee to recover the actual cost of the Commission in preparing the EIR or Negative Declaration. A deposit shall be charged the proponent as set forth below:
A deposit of thirty dollars ($30) for each one thousand dollars ($1,000) of the estimated capital cost of the project up to one hundred thousand dollars ($100,000), ten dollars ($10) for each one thousand dollars ($1,000) over one hundred thousand dollars ($100,000) and up to one million dollars ($1,000,000), five dollars ($5) for each one thousand dollars ($1,000) over one million dollars ($1,000,000) and up to five million dollars ($5,000,000), two dollars ($2) for each one thousand dollars ($1,000) over five million dollars ($5,000,000) and up to ten million dollars ($10,000,000), one dollar ($1) for each one thousand dollars ($1,000) over ten million dollars ($10,000,000) and up to one hundred million dollars ($100,000,000), and fifty cents ($0.50) for each one thousand dollars ($1,000) over one hundred million dollars ($100,000,000). A minimum deposit of five hundred dollars ($500) shall be charged for projects with an estimated capital cost of sixteen thousand dollars ($16,000) or less.
If a project lacks a capital cost basis, the Commission, presiding officer, or Administrative Law Judge shall determine, as early as possible, the deposit to be charged.
(2) The deposit shall be collected whenever an EIR or Negative Declaration is requested or required. The costs of preparing the EIR or Negative Declaration shall be paid from such deposits.
(3) Proponent shall pay the applicable deposit in progressive payments due as follows: One-third of the deposit at the time the application or pleading is filed, an additional one-third no later than 120 days after the time the application or pleading is filed, and the remaining one-third no later than 180 days after the time the application or pleading is filed. Failure to remit full payment of the deposit no later than 180 days after the time the application or pleading is filed may subject the proponent to a fine not exceeding 10 percent of the outstanding amount due. If the costs exceed such deposit the proponent shall pay for such excess costs within 20 days of the date stated on the Commission's bill for any excess costs. If the costs are less than the deposit paid by the proponent, the excess shall be refunded to the proponent.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Section 21165, Public Resources Code.
Any party may file in any proceeding before the Commission a motion for determination of whether the proceeding involves a project subject to or exempt from the California Environmental Quality Act of 1970, Public Resources Code, Sections 21000 et seq., and Rule 17.1.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 21000 et seq., Public Resources Code.
Review of development projects within the meaning of Chapter 1200 of the Statutes of 1977 (Government Code Sections 65920 et seq.) shall be in accord with the procedures and requirements of that chapter, the Permit Guidelines promulgated by the Office of Planning and Research (State Administrative Manual Sections 1070 et seq.), and applicable rules and procedures of the Commission. Commission Information and Criteria Lists for applications subject to Chapter 1200, Statutes 1977 shall be available from the Commission staff.
Note: Authority cited: Section 1701, Public Utilities Code. Reference: Sections 65920 et seq., Government Code.