Public Utilities Commission of the State of California |
|
Timothy J. Sullivan, Executive Director |
|
|
|
Headquarters |
Southern California Office |
505 Van Ness Avenue |
320 West 4th Street, Suite 500 |
San Francisco, CA 94102 |
Los Angeles, CA 90013 |
(415) 703-2782 |
(213) 576-7000 |
|
|
Website: http://www.cpuc.ca.gov |
|
Calendar Archive: prior to year 2000 http://www.cpuc.ca.gov/daily_calendar_archive/ |
|
Daily Calendar
· Commission Meetings
· Public Meetings and Workshops
· Notice of Draft Resolutions (PU Code § 311(g))
· New Filings
· Petitions for Modification and Applications for Rehearing
· Advice Letter Submissions
· Miscellaneous Transportation Items
· Miscellaneous Communications Matters
· Table of Submission Dates for the Preceding Two Weeks
· Changes to Hearing Calendar
· Hearings
|
The Commission’s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. |
|
The CPUC encourages all Californians to participate in its meetings,
hearings, workshops, and proceedings. We try to hold our public meetings
only in places that are wheelchair accessible and which can accommodate
specialized equipment and other services useful to people with disabilities.
Please see the notice of the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor’s Office at least three business days in advance of the meeting. Contact the Public Advisor’s Office by any one of the following: |
||
Email: public.advisor@cpuc.ca.gov |
FAX: 415-355-5404 (Attn.: Public Advisor) |
|
October 12, 2017 |
9:30 am |
San Francisco, CA
|
October 26, 2017 |
9:30 am |
State Personal Board 801 Capitol Mall Sacramento CA 95814
|
November 09, 2017 |
9:30 am |
San Francisco, CA |
Ratesetting Deliberative Meeting dates are reserved as noted but will only be held if there are ratesetting matters to be considered.
October 09, 2017 |
10:00 am |
San Francisco, Room 5305 |
October 23, 2017 |
10:00 am |
San Francisco, Room 5305 |
November 06, 2017 |
10:00 am |
San Francisco, Room 5305 |
October 11, 2017 |
California Public
Utilities Commission - Auditorium |
More information on the Committee meeting is available at http://www.cpuc.ca.gov/commissionercommittees/
October 11, 2017 |
California Public
Utilities Commission - Auditorium |
More information on the Committee meeting is available at http://www.cpuc.ca.gov/commissionercommittees/
“The
below notices having been duly noticed in the Daily Calendar and along with the
requisite ruling, scoping memo or other order issued in the specific
proceedings satisfy the requirements of the Commission’s Rules of Practice and
Procedure Rule 8.1(c) such that no ex parte communication shall be considered
to occur should a decisionmaker or an advisor be present at the meeting or
workshop.”
October 4, 2017 |
California Independent System Operator 250 Outcropping Way Folsom, CA 95630 Web Address (URL): http://ems7.intellor.com/login/714104 Audio connection instructions will be available after connecting to the web conference.
Telephone Only Participation Please only use this dial-in method if unable to participate by web to ensure the ability to participate in Q&A. Call-in: 1-877-369-5230, Access Code: 0174794#
Technical Support: Contact AT&T Connect support at 1-888-796-6118 |
AGENDA
This is the third in a series of joint agency workshops designed to assist CAISO in its stakeholder initiative process to develop clear tariff rules and practices around pre-contingency dispatch of Demand Response (DR) resources to count for local Resource Adequacy (RA) capacity, as well as operating procedures for post-contingency notification of DR resources. Topics that will be presented and discussed include the results of an analysis on potential availability requirements for slow response resources (for example demand response resources that cannot respond in less than 20 minutes) that must be dispatched pre-contingency to meet local capacity area reliability needs. An initial analysis was presented at the joint workshop on October 3, 2016. The workshop discussion will include how the availability needs determined by the Transmission Planning Process (TPP) study could be operationalized into market rules, resource adequacy rules and demand response program requirements. A more detailed agenda will be provided to the Demand Response and Resource Adequacy service lists. For questions about this workshop, please contact Bruce Kaneshiro at bsk@cpuc.ca.gov.
October 4, 2017 10am – 4pm |
SoCalGas Energy Resource Center 9240 Firestone Blvd. Downey, CA 90241
Join by phone 1 (213) 231-9998 (Los Angeles) Conference ID: 51259784
|
Event Registration: To register for this event, please follow this link, https://www.eventbrite.com/e/low-income-multifamily-working-group-quarterly-meeting-tickets-37950684519.
We are interested in a counting of in-person versus webinar attendees.
Draft Agenda: Meet and greet; Introduction and Opening Remarks, IOU program administrators to present ESA MF program implementation diagrams; NRDC and parties’ alternative program design proposal; panel discussions for key implementation activities; General discussion and agenda setting a. Agenda for next quarterly and ad hoc meetings; & b. Wrap-up A detailed and final agenda will be posted prior to the meeting at www.energydataweb.com and will be distributed to the EE/ESA Service Lists and other outreach distribution.
NOTE: In-person attendees are limited to 50 people. We are requesting each organization to limit the in-person attendance to 3 people only. We do not have such limitation for the webinar attendees. Parties who have questions regarding the public meeting may contact Caroline Chen ccchen@san.rr.com, 619-606-4438
October 4, 2017 |
California Public
Utilities Commission - Auditorium
WebEx information: https://van.webex.com/van/j.php?MTID=m7c6650db28e3a88acc54c8f9441ce748
Meeting number: 747 849382 Meeting password: !Energy1 |
October 5, 2017
|
Sheraton Fairplex Hotel
& Conference Center |
AGENDA
The CPUC will be joined by the Honorable Gwen Moore, executives of investor-owned utilities, community leaders, and others to review the progress, commitments, and initiatives made to increase procurement by regulated utilities and other entities from women, minority, disabled veteran, and lesbian, gay, bisexual, and transgender owned businesses.
October 5, 2017 |
California Public
Utilities Commission
Alternate Public and Teleconferenced Locations: Junipero
Serra State Office Building
Mammoth Lakes Mono County CAO Conference Room Sierra Center Mall 452 Old Mammoth Road Mammoth Lakes, California 93546
|
AGENDA
1) Introduction; 2) Approval of June 22, 2017, Meeting Minutes; 3) Administrative Services report: CHCF-A Financial Report; 4) Liaison Reports: a) Communications Division report; b) Legal Division report; 5) Public Comments; 6) Future Meeting Date; 7) Adjournment.For questions about this meeting, please contact: Michael Coen via e-mail at michael.coen@cpuc.ca.gov or (415) 703-2628.
October 5, 2017 |
California Public
Utilities Commission – Golden Gate Room
Remote Access details to follow.
|
AGENDA
The California Public Utilities Commission (CPUC) will host a workshop in R.12-06-013 on October 5, 2017. At the workshop, Pacific Gas & Electric Company, Southern California Edison Company, San Diego Gas & Electric Company and stakeholders will discuss potential modifications to the discount structure of the California Alternate Rates for Energy (CARE) programs and associated research needs. Although a quorum of Commissioners and/or their staff may be in attendance, no official CPUC action will be taken at this event.For questions, please contact Whitney Richardson at whitney.richardson@cpuc.ca.gov or 415-703-2108.
October 10, 2017 9am – 12 pm |
California Public Utilities Commission – Auditorium 505 Van Ness Avenue, (Corner of Van Ness Ave and McAllister St) San Francisco, CA 94102
|
AGENDA
The California Public Utilities Commission (CPUC) will host a workshop in R.12-12-011 on October 10, 2017. At the workshop, there will be two panels discussions. One panel will consist of local planning agencies discussing the need for TNC data, including confidential information, and how it should be provided. A second panel discussion will consist of TNCs discussing the benefits and barriers of sharing data and the appropriate level of data aggregation needed. Although a quorum of Commissioners and/or their staff may be in attendance, no official CPUC action will be taken at this event. For questions, please contact Brewster Fong at Brewster.Fong@cpuc.ca.gov or 415 703-2187.
Public Meeting Notice: Deaf and Disabled Telecommunications Program (DDTP) - Equipment Program Advisory Committee (EPAC)
October 13, 2017 |
DDTP Main Office
|
PUBLIC MEETING AGENDA
I. Administrative Business: A. Introductions, B. Agenda Modification and Approval, 1. Review of Emergency Evacuation Procedures, C. Review of Minutes from Previous Meetings; II. CPUC Update; III. Public Input; IV. CCAF Staff Reports: A. CRS Report, B. Field Operations Report, C. Marketing Report, D. Consumer Affairs Report, E. Customer Contact Report, F. Equipment Report, G. Wireless Report; V. Lunch; VI. Committee Member Equipment Update; VII. EPAC Business: A. Report from the Chair, B. Review of Action Items List, C. Member Reports; VIII. Future Meetings and Agendas.
ADDITIONAL INFORMATION
For additional information, please contact Reina Vazquez, DDTP Committee
Coordinator, (510) 302-1147, or by email at rvazquez@ddtp.org,
or visit the website at ddtp.org. If you plan to attend the
meeting and need sign language interpreters or other special communication
accommodations, please call the DDTP office at least five days prior to the
meeting date.
ENVIRONMENTAL REMINDER
Please refrain from wearing perfumes or scents to DDTP meetings. Persons with
environmental illness or multiple-chemical sensitivity must reduce their
exposure in order to attend this meeting.
DOCUMENT PREPARATION
All documents reviewed by EPAC must be available in a Braille format:
Therefore, when submitting documents for the EPAC binder, please send a copy,
in an electronic format, to rvazquez@ddtp.org
for Brailling prior to the meeting. Handouts should also be made available in
an electronic format.
October 16, 2017 |
San Francisco, CA
94102 To Join Web Conference: Click here: https://energy.webex.com; Meeting ID: 928 215 208
|
AGENDA
The Vehicle-Grid Integration (VGI) Communication Protocol working
group, which is designed to inform the Commission’s rulemaking under
R.13-11-007 and related proceedings, will meet according to the above schedule.
Any changes to the schedule will be noticed on the Daily Calendar, including updates on locations for the all-day meetings. A current schedule will also be available at www.cpuc.ca.gov/vgi.
Background
The California Public Utilities Commission, California Energy Commission, and other State agencies convened this working group to assess how and whether the adoption of a communications protocol is necessary to enable Plug-In Electric Vehicle-Grid Integration (VGI) resources to more economically participate in electricity markets at scale.
Participants of the working group will identify and assess opportunities in which VGI can create value from multiple market participants’ perspectives, communication protocols needed to deliver that value, and concepts for how utilities, automakers, electric vehicle service providers, aggregators, and others can develop pathways to market for a VGI resource.
The working group will allow
participants to review, understand, and discuss the technical details of
existing communication protocols. The recommendations of the working group will
be considered and incorporated in CPUC’s Rulemaking 13-11-007 (and/or the SB
350 Transportation Electrification applications A.17-01-020, A.17-01-021 and
A.17-01-022) and the Energy Commission’s Integrated Energy Policy Report (IEPR)
proceeding for future policy decisions. Anyone interested in participating in
the VGI Working Group should contact Amy Mesrobian (amy.mesrobian@cpuc.ca.gov or
415-703-3175) or Carrie Sisto (cs8@cpuc.ca.gov
or 415-703-2872).
Public Workshop Notice: R.15-03-011 -Workshop 2
of 2 on AB 2868 Implementation
October 17, 2017 |
California Public
Utilities Commission - Auditorium
WebEx information: https://van.webex.com/van/j.php?MTID=m63dff8ef34ae16466e53619c02285b7c |
October 26, 2017 |
To Listen by Phone |
AGENDA
This is a monthly telephonic meeting where the co-leads for the Peer Develop
Panel (PDP) will provide to the assigned Commissioner, the Commissioner’s
Advisor(s), assigned Administrative Law Judges, and/or Commission staff a
status report regarding the development of Fire Map 2 in accordance with the
schedule and procedures adopted by Decision 17-01-009. The agenda for the
meeting is for the PDP to provide: (1) A brief summary of progress to
date (first meeting) or since the previous meeting. (2) A succinct description
of the next deliverable(s) and/or milestone(s) the PDP is working toward, and
whether the PDP is on schedule. (3) Opportunity for questions from
the Assigned Commissioner, the Commissioner’s Advisor(s), assigned
Administrative Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting
using the listen-only toll-free number and passcode provided above. For
questions regarding the monthly telephonic status meetings, please contact
Martin Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
October 31, 2017 |
State Capitol Room 4203 |
AGENDA
As the electric sector experiences rapid changes, the Commission formed the California Customer Choice Project (Project) to examine the issues and produce a report evaluating regulatory framework options in early 2018. To this end, the Commission will hold an informal public workshop to gather stakeholder input on global and national electric market choice models, including California's 2020 market. Speakers will include California stakeholders and representatives from out-of-state electric markets who will present key insights to help guide the evolution of the regulatory framework for customer choice in California. For information about the California Customer Choice Project, visit: http://www.cpuc.ca.gov/choiceworkshop/
Telephonic - Public Meeting Notice: R.15-05-006 - Status Report Regarding the Development of Fire-Threat Maps.
November 30, 2017 |
To Listen by Phone |
AGENDA
this is a monthly telephonic meeting where the co-leads for the Peer
Develop Panel (PDP) will provide to the assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of Fire Map 2 in
accordance with the schedule and procedures adopted by Decision 17-01-009. The
agenda for the meeting is for the PDP to provide: (1) A brief summary of
progress to date (first meeting) or since the previous meeting. (2) A succinct
description of the next deliverable(s) and/or milestone(s) the PDP is working
toward, and whether the PDP is on schedule. (3) Opportunity for questions
from the Assigned Commissioner, the Commissioner’s Advisor(s), assigned Administrative
Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
Telephonic - Public Meeting Notice: R.15-05-006 -
Status Report Regarding the Development of Fire-Threat Maps
December 28, 2017 |
To Listen by Phone |
AGENDA
this is a monthly telephonic meeting where the co-leads for the Peer
Develop Panel (PDP) will provide to the assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of Fire Map 2 in
accordance with the schedule and procedures adopted by Decision 17-01-009. The
agenda for the meeting is for the PDP to provide: (1) A brief summary of
progress to date (first meeting) or since the previous meeting. (2) A succinct
description of the next deliverable(s) and/or milestone(s) the PDP is working
toward, and whether the PDP is on schedule. (3) Opportunity for questions
from the Assigned Commissioner, the Commissioner’s Advisor(s), assigned
Administrative Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
The ALJ
Division has prepared Draft Resolution ALJ-347 for the October
12, 2017 Commission Meeting. The resolution adopts the Expedited
Interconnection Dispute Resolution Process set forth in Exhibit A as authorized
by assembly Bill 2861. Any comments must be served electronically on ALJ Cooke
at mlc@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=195358011.
The Energy Division has prepared Draft Resolution E-4828 for the October 12, 2017 Commission Meeting. This Resolution addresses Pacific Gas and Electric Company’s update to the bundled procurement plan regarding procurement and future updates. All questions and/or comments should be addressed to Eric Dupre at Eric.Dupre@cpuc.ca.gov and Michele Kito at michele.kito@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=195439703
The Communications Division has prepared Draft Resolution T-17577 which will be on the Commission’s October 12, 2017 meeting agenda. Resolution T-17577 conditionally approves the Wireless Identification Registration Application of STS Media dba FreedomPop, subject to the payment of past due surcharges and user fees including penalties and a fine for operating without authority. The Communications Division e-mailed the Notice of Availability letter for this resolution to parties in accordance with P.U. Code Section 311(g)(1). Instructions and timelines for filing comments and protesting the proposed fine as well as the service list for this resolution are included in the Notice of Availability. Any questions or comments should be directed to Penney Legakis; email: penney.legakis@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M195/K462/195462788.PDF
The Communications Division has prepared Draft Resolution T-17578 which will be on the Commission’s October 12, 2017 meeting agenda. Resolution T-17578 conditionally approves the Wireless Identification Registration Application of Redding MSA Limited Partnership DBA Verizon Wireless, subject to the payment of past due surcharges and user fees including penalties and a fine for operating without authority. The Communications Division e-mailed the Notice of Availability letter for this resolution to parties in accordance with P.U. Code Section 311(g)(1). Instructions and timelines for filing comments and protesting the proposed fine as well as the service list for this resolution are included in the Notice of Availability. Any questions or comments should be directed to Penney Legakis; email: penney.legakis@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M195/K464/195464007.PDF
The Energy Division has prepared Draft Resolution E-4883 for the October 26, 2017 Commission Meeting. This Resolution addresses verification of the attainment of the 89 MW Load Trigger for Phase 2 of the Line 625/650 Upgrade Project Pursuant to D.15-03-020, request for approval under Advice Letter 64-E. All questions or comments should be addressed to Michael Rosauer at michael.rosauer@cpuc.ca.gov and Mary Jo Borak at maryjo.borak@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=194273899
Resolution L-548 authorizes the disclosure of records concerning the California Public Utilities Commission Safety and Enforcement Division’s investigation of an electrical incident that occurred at 518 Workman Mill Road in La Puenta, CA on April 12, 2016.
On September 22, 2017, the
draft resolution was mailed, pursuant to California Public Utilities Code
§ 311(g) and Rule 14.5 of the Commission’s Rules of Practice and Procedure.
Comments shall be served no later than October 16, 2017 and reply comments
shall be served no later than October 23, 2017.
Resolution L-548 will be on the agenda at the October 26, 2017 Commission meeting. The Commission may then vote on this draft resolution, or it may postpone a vote.
When the Commission acts on the draft resolution, it may adopt all or part of it as written, amend or modify it, or set it aside and prepare its own order. Only when the Commission acts does the resolution become binding on the parties.
Finally, an original and two copies of the comments, with a certificate of service should be submitted to:
Fred Harris,
Staff Counsel
Legal Division
California Public Utilities Commission
505 Van Ness Avenue, Room 5040
San Francisco, CA 94102-3298
Telephone: 415-703-1557
E-mail: Fred.harris@cpuc.ca.gov; Angela.hagler@cpuc.ca.gov;
The Safety and Enforcement Division has prepared Draft Resolution ST-206 for October 26, 2017. This Resolution grants the San Francisco Bay Area Rapid Transit District’s request for approval of its Safety and Security Certification Plan for its Communications-Based Train Control project. Any questions or comments should be directed to Jamie Lau at
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?DaySearch=1
The Water Division has prepared Proposed Comment Resolution W-5151 for the October 26, 2017 Commission Meeting. Proposed Comment Resolution W-5151 authorizes Llano Del Rio Water Company a General Rate Increase to produce additional annual revenues of $35,446 or 19.9% for Test Year 2017 and $23,049 or 10.8% for Escalation Year 2018, to be paid for by the Ratepayers. Please contact water.division@cpuc.ca.gov, and reference “Proposed Comment Resolution W-5151” if you have any questions.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=195475407
The ALJ Division has prepared revisions to Draft Resolution ALJ-344 for the November 9, 2017 Commission meeting. The revisions include revisions to the originally proposed amendments to the Rules of Practice and Procedure (Title 20, Division 1, of the California Code of Regulations) to implement statutory amendments pursuant Senate Bill 215, reflect changes in the Commission’s administration, streamline certain procedures, and provide greater clarity. Notice of these revisions to the draft has been sent to subscribers to the Rules-Update list for notification of proposed changes to the Rules of Practice and Procedure. (See https://ia.cpuc.ca.gov/rulesupdate/.)
Pursuant to Government Code §§ 11346.4 and 11351, and California Code of Regulations, Title 1, §§ 1-120, notice of these revisions to the originally proposed amendments starts the 15-day notice and comment period, which closes at 5:00 p.m. on October 16, 2017. Any person may submit written comments concerning the revisions to the originally proposed rule amendments to ALJ Hallie Yacknin by email to hallie.yacknin@cpuc.ca.gov or by post at California Public Utilities Commission, 505 Van Ness Ave., San Francisco, CA 94102.
The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=195055105
The Energy Division has prepared Draft Resolution E-4882 for the November 9, 2017 Commission Meeting. This Resolution addresses Pacific Gas and Electric Company’s Marketing, Education and Outreach Plan in Compliance with the December 17, 2015 Assigned Commissioner and Administrative Law Judge’s Ruling and Decision 15-07-001 on Residential Default Time of Use Rates. All questions and/or comments should be addressed to Whitney Richardson at Whitney.Richardson@cpuc.ca.gov and Paul Phillips at paul.phillips@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=196315358
09-13-2017 |
A.17-09-005 - Application of San Diego Gas & Electric Company (U 902 M) for Authority to Implement Rate Relief and Increase Spend in Support of the San Diego Unified Port District’s Energy Management Plan. |
|
|
09-25-2017 |
A.17-09-022 - Application of Damaris Express, Inc. (PSG36953) for authority to operate as an On-Call passenger stage corporation between points in San Diego County, Riverside County, Orange County, Los Angeles County and San Bernardino; and to establish a Zone of Rate Freedom. (HARD COPY FILING) |
|
|
NONE
To protest a filing, mail the
original letter/telegram to the Chief of the appropriate division (i.e.,
"Chief, [Energy, Communications or Water] Division"), to be received
no later than 20 days after the date the Advice Letter was filed.
"Effective
TBD" means that the date is to be determined by further Commission
action. A date listed as "anticipated effective" may be subject to
change. An Advice Letter Supplement is not a new filing, and there is no
protest period unless indicated.
NONE
NONE
NONE
|
|
|
|
|
|
|
|
ALJ Cooke |
A.17-01-020 - Application
of San Diego Gas & Electric Company (U902E) for Approval of SB 350
Transportation Electrification Proposals, |
ALJ Kao |
A.16-07-015 - Application
of Southern California Edison Company (U338E), San Diego Gas & Electric
Company (U902E) and the Natural Resources Defense Council for Rehearing of
Resolution E-4792, |
ALJ Atamturk |
A.17-07-008 - In the
Matter of the Application of SQF, LLC for a Certificate of Public Convenience
and Necessity to Provide Full Facilities-Based Local Exchange and
Interexchange Telecommunications Services within California, |
ALJ Miles |
A.17-08-010 - In the
Matter of the Application of ROI Networks, LLC for authorization to obtain a
Certificate of Public Convenience and Necessity as a Telephone Corporation to
Operate as a Provider of Limited Facilities-Based and Resold Local Exchange
Services throughout the State of California pursuant to the Provisions of Public
Utilities Code Section 1001, |
Dates in parentheses following the word “also” are subject to change without notice. The assigned Commissioner’s name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.
(PHC) = Prehearing Conference |
(WS) = Workshop |
(OA) = Oral Argument |
(PPH) = Public Participation Hearing |
(STC) = Status Conference |
(SEC) = Settlement Conference |
(EH) = Evidentiary Hearing |
(L&M) = Law & Motion |
(CA) = Closing Argument |
|
|
10/03/17 |
A.15-09-013 (EH) - In
The Matter of the Application of San Diego Gas & Electric Company (U902G)
and Southern California Gas Company (U904G) for a Certificate of Public
Convenience and Necessity for the Pipeline Safety & Reliability Project, |
|
|
10/04/17 |
A.17-04-012 (EH) -
Application of Proper Sightseeing Corporation, a California corporation, for
Authority to Operate as a Scheduled Passenger Stage Corporation with Hop
On/Hop Off Service on Fixed Routes Between Points in Hollywood, California
and Santa Monica, California; and to Establish a Zone of Rate Freedom, |
|
|
10/06/17 |
A.16-12-011 (EH) - Application
of Southern California Gas Company (U904G) for authority to establish a
memorandum account to record expenses for system reliability efforts
associated with expiring rights-of-way on Morongo Indian Reservation and
related relief, |
|
|
10/09/17 |
C.17-08-006 (PHC) - City
of Rolling Hills, Complainant vs. California Water Service Company (U60W)
Defendant, for the following Orders, to wit: (1) to utilize prior customer
information in order to determine the base allocation for those parcels
belonging to persons who came to reside in the City following December 31,
2012; (2) provide an individualized water budget for these properties using
aerial imagery and GIS analysis; and (3) reimburse these residents for any
improper surcharges resulting from Defendant's inaccurate water-budget
calculations and allocations during the entire surcharge period beginning in
June 2015, based on the methodology in( 1) or( 2) above, that provides the
highest water budget for these parcels, |
|
|
10/10/17 |
A.16-12-002 (EH) - Joint
Application of Southern California Edison Company (U338E) and San Diego Gas
& Electric Company (U902E) For Cost Recovery Of The Wheeler North Reef
Expansion Project Marine Mitigation Costs,
|
|
|
10/11/17 |
R.03-10-003 (EH) - Order
Instituting Rulemaking to Implement Portions of AB117 concerning Community
Choice Aggregation, |
|
|
10/12/17 |
A.17-03-020 (EH) - Application
of Southern California Edison Company (U338E) for Recovery of Aliso Canyon
Utility Owned Energy Storage Costs, |
|
|
10/13/17 |
A.17-06-020 (TELEPHONIC –
PHC) - Application of the North American Numbering Plan Administrator, on
behalf of the California Telecommunications Industry, for Relief of the 909 Numbering
Plan Area, |
|
|
10/13/17 |
(ECP) C.17-08-014 (EH) - William
E. DuBose and Unifinity, Inc., Complainants, vs. T-Mobile West, LLC (U3056C),
Defendant [for a Refund and for Relief from Unauthorized and Improper
Charges, |
|
|
10/16/17 |
A.17-07-010 (PHC) - In
the matter of the Application of the Golden State Water Company (U133W) for
an order authorizing it to increase rates for water service by $31,329,400 or
10.56% in 2019, to increase by $10,770,900 or 3.28% in 2020; and increase by
$12,924,400 or 3.81% in 2021, |
|
|
10/16/17 |
C.17-08-001 (PHC) - Circle
Drive Properties, LLC vs. Southern California Gas Company (U904G) [for an
order scheduling reinstallation of a Gas Meter and the reactivation of
service at 131883 Circle Drive, Laguna Beach, California.], |
|
|
10/16/17 |
C.17-08-007 (PHC) - Radiant
BMT, LLC, Complainant vs. Southern California Edison Company (U338E),
Defendant [for a determination that Complainant’s Projects 1, 2, 3, and 4 are
eligible for the As-Available Non-Peaking (AANP) Product Type and order
defendant to process the Projects’ Program Participation Requests (PPRs) for
four (4) projects as AANP projects within defendant’s Renewable Market
Adjusting Tariff (ReMAT) program at the prevailing price at the time the PPRs
were submitted.], |
|
|
10/17/17 |
A.07-01-031 (EH) - In
the Matter of the Application of Southern California Edison Company (U338E)
for a Permit to Construct Electrical Facilities with Voltages between 50kV
and 200 kV: Valley-Ivyglen 115 kV Subtransmission Line Project, |
|
|
10/17/17 |
A.16-06-013 (TELEPHONIC –
PHC) - Application of Pacific Gas and Electric Company to Revise its
Electric Marginal Costs, Revenue Allocation and Rate Design. (U39M), |
|
|
10/17/17 |
C.17-08-008 (PHC) - Rodney
and Alice Wilson Family Revocable Trust of 1999, Michael Wilson, Trustee,
Complainant vs. Pacific Bell Telephone Company, dba AT&T California
(U1001C), Defendant [for Relief from Improper Placement of facilities
outside of utility easement.], |
|
|
10/17/17 |
C.17-08-002 (PHC) - Joseph
Figeras and Tammy Figeras (f/k/a Tammy Gibson) vs. Pacific Gas and Electric
Company (U39E) [for immediate relief in having power restored to
Complainants’ premises; for Reimbursement of the approximate sum of $28,000;
for reimbursement of all KWH generated by Complainants’ installed Solar System;
for refund of overbilling; and related relief], |
|
|
10/18/17 |
A.14-10-015 (EH) - In
the Matter of the Application of AVALON FREIGHT SERVICES, LLC, a limited
liability company, for a certificate of public convenience and necessity
authorizing service to transport freight by vessel on a scheduled basis
between Port of Los Angeles, California on the one hand, and the Santa
Catalina Island location of Avalon, on the other hand; and on a nonscheduled
charter basis between Port of Los Angeles, California and Avalon, Two Harbors
and all points on Santa Catalina Island, and between any points on Santa
Catalina Island, |
|
|
10/20/17 |
A.17-08-019 (PHC) - Application
of the California High-Speed Rail Authority to construct proposed high-speed
tracks and underpass grade separations at SR99 (MP 195.74) and SR99 Ramp (MP
195.83) within the City of Fresno, California, |
|
|
10/20/17 |
A.17-08-022 (TELEPHONIC –
PHC) - Application of the City of Victorville to construct an overhead
grade-separation structure for Green Tree Boulevard in the City of
Victorville, San Bernardino County, State of California, |
|
|
10/23/17 |
C.17-08-015 (TELEPHONIC –
PHC) - Mannar Investment Company, LP, Complainant, vs. Pacific Gas and
Electric Company (U39E), Defendant [for Relief from failure of Defendant to
provide service under its Tariff Rue 16(f)], |
|
|
10/24/17 |
A.16-03-004 (STC) - Joint
Application of Southern California Edison Company (U338E) and San Diego Gas
& Electric Company (U902E) For the 2015 Nuclear Decommissioning Cost
Triennial Proceedings, |
|
|
10/25/17 |
A.12-04-019 (EH) - Application
of California-American Water Company (U210W) for Approval of the Monterey
Peninsula Water Supply Project and Authorization to Recover All Present and
Future Costs in Rates, |
|
|
10/25/17 |
(ECP) C.17-07-005 (EH) - Lidiya
Bizhko, Complainant. vs. Pacific Gas and Electric, Defendant, for relief from
inaccurate billing, |
|
|
11/02/17 |
C.17-09-001 (PHC) - Martinez
Masonic Temple Association, Complainant vs. Pacific Gas and Electric Company
(U39E), Defendant [ for an Order that defendant move its Power Lines a safe
distance away from 700 Masonic Street to allow maintenance of the building as
defined by OSHA and PGE’s Safety Requirements with no cost to complainant;
and related relief. ], |
|
|
11/06/17 |
A.16-10-019 (EH) -
Application of Pacific Gas and Electric Company to Recover Costs Recorded in
the Catastrophic Event Memorandum Account Pursuant to Public Utilities Code
Section 454.9(U39E), |
|
|
11/13/17 |
A.16-09-001 (PPH) - Application
of Southern California Edison Company (U338E) for Authority to Increase its
Authorized Revenues for Electric Service in 2018, among other things, and to
Reflect that increase in Rates, |
|
|
11/16/17 |
A.17-04-023 (EH) - Application
of PacifiCorp (U901E) To Recover Costs Recorded in the Catastrophic Event
Memorandum Account, |
|
|
11/20/17 |
A.17-05-022 (EH) - Application
of California Water Service Company (U60W) for a Certificate of Public
Convenience and Necessity to Provide Water Service to Travis Air Force Base
and to Establish Rates, |
|
|
11/27/17 |
A.15-07-019 (EH) - Application
of California-American Water Company (U210W) for Authorization to Modify
Conservation and Rationing Rules, Rate Design, and Other Related Issues for
the Monterey District, |
|
|
11/28/17 |
A.16-12-010 (EH) - In
the Matter of the Application of Southern California Gas Company (U904G)
Requesting Reauthorization of the Customer Incentive Program, |
|
|
11/29/17 |
A.17-04-017 (EH) - Application
of San Diego Gas & Electric Company (U902E) for Approval of the Results
from its 2016 Track IV Local Capacity Requirement Preferred Resources
Requests for Offers, |
|
|
12/14/17 |
A.16-06-013 (EH) - Application
of Pacific Gas and Electric Company to Revise its Electric Marginal Costs,
Revenue Allocation and Rate Design. (U39M), |
|
|
01/08/18 |
A.17-04-010 (PHC) - Application
of Pacific Gas and Electric Company (U39E) for a certificate of public
convenience and necessity to provide: (i) full facilities-based and resold
competitive local exchange service throughout the service territories of
AT&T California, Frontier California Inc., Consolidated Communications of
California Company, and Citizens Telecommunications Company of California;
and (ii) full facilities-based and resold non-dominant interexchange services
on a statewide basis, |
|
|
04/09/18 |
I.17-04-019 (EH) - Order
Instituting Investigation to determine whether PacifiCorp (U901-E) engages in
least-cost planning on a control area basis and whether PacifiCorp's
Inter-Jurisdictional Cost Allocation Protocol results in just and reasonable
rates in California, |
|
|
04/16/18 |
R.17-06-026 (EH) - Order
Instituting Rulemaking to Review, Revise, and Consider Alternatives to the
Power Charge Indifference Adjustment, |
|
|