1. Logbooks, training, and human resources

1 Further information on the Commission's Power Plant Performance program may be found at the Commission's Web Site at http://www.cpuc.ca.gov/PowerPlantStandards.

2 This plant is distinct from the 1311 megawatt Pittsburg Power Plant owned by Mirant Corporation.

3 CPSD inspects a power plant when outages or curtailments reduce the plant's output by 50 MW or more.

4 Operation Standard 1, Assessment Guideline A and C.

5 Delta Energy Center Infrared Thermography Report dated September 20, 2006

6 Delta Energy Center Infrared Thermography Report dated September 20, 2006

7 Operation Standard 1, Assessment Guideline A and C.

8 OSHA - Code of Federal Regulation Title 29 Part 1910 requires hot surfaces within 7 feet of the ground be covered with insulating materials or guarded in manners as to prevent contact.

9 Operation Standard 1, Assessment Guideline A and C.

10 OSHA 29 CFR 1910.101 Compressed gas guidelines provide accepted storage, handling and use practices for users of compressed gas.

11 Operation Standard 1, Assessment Guideline A and C.

12 Operation Standard 1, Assessment Guideline A and C.

13 Operation Standard 7, Assessment Guideline A, G, & I

14 Operations Standard 8, Assessment Guideline No. B5,B7, B10, & B12

15 Operations Standard 8, Assessment Guideline No. B5,B7, B10, & B12

16 Operations Standard 8, Assessment Guideline No. B5,B7, B10, & B12

17 Federal regulations require secondary containment. See 40 CFR 264.175(b)(1), "A base must underlie the containers which is free of cracks or gaps and must be sufficiently impervious to contain leaks, spills, and accumulated precipitation until the collected material is detected and removed."

18 Operations Standard 8, Assessment Guideline No. B5,B7, B10, & B12

19 Operations Standard 8, Assessment Guideline No. B5,B7, B10, & B12

20 Operations Standard 8, Assessment Guideline No. B5,B7, B10, & B12

21 Operations Standard 8, Assessment Guideline No. B5,B7, B10, & B12

22 The practice also conflicts with the plant's Safety and Health Plan (SHP) and the National Fire Protection Association (NFPA) Code 4.5.6.2

23 Operations Standard 8, Assessment Guideline No. B5,B7, B10, & B12

24 Operation Standard 10, Assessment Guideline A

25 Operations Standard 10, Assessment Guideline A

26 Operation Standard 1, Assessment Guideline 4; operation standard 6, Assessment Guideline 6

27 No. 13-5.6

28 Operation Standard 1, Assessment Guideline 4; operation standard 6, Assessment Guideline 6

29 Operation Standard 1, Assessment Guideline 4; operation standard 6, Assessment Guideline 6

30 The lack of a self-closer also violates OSHA standards.

31 Operation Standard 14, Assessment Guideline a and B

32 Procedure SHP-7, Revision 3, Titled, "Lockout/Tagout/Try", Paragraph 7.1.1.6 states, "Based on the information gathered during the work scope review, the Issuing Operator shall complete sections 1, 2, and 3 of the LOTOT Clearance Form." The clearance form is Enclosure 7.2a of Procedure SHP-7.

33 Delta Energy Center May 2006 HRSG Inspection Report

34 Loss Prevention Report by Hartford Steam Boiler Inspection and Insurance Company dated May 22, 2006

35 Crane Valve Service Safety Valve Test Records dated July 12, 2006

36 Delta Energy Center Infrared Thermography Report dated September 20, 2006

37 Delta Energy Center PAP-11 Rev00 dated 2/13/07

38 See ASME B31 Pressure Piping Code

39 Delta Energy Center Ultrasonic Testing Measurements Rev060606

40 OSHA standard 1926.152(b) (4) (ii) requires self-closers.